Pre-commissioning tests for substations from Shaktimark, Neo series: 3 plant size options between 1 MW and 10 MW. Design: final dossier for handover, defect register shared daily and checklist driven testing. Typically used for lender completion, renewable parks and EPC handover. Delivered in line with IEC 62446-1, IS 3043 and IEC 61557. Mobilisation On-site 3-21 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Shaktimark
- Model
- SHA-1A6 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- On-site 3-21 days
- Warranty
- Report accuracy guaranteed
- Standards
- IEC 62446-1, IS 3043, IEC 61557
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant size1 MWSHA-1A6-01 | Plant size: 1 MW | 1 site · On-site 3-21 days | for verified buyers |
| Plant size5 MWSHA-1A6-02 | Plant size: 5 MW | 1 site · On-site 3-21 days | for verified buyers |
| Plant size10 MWSHA-1A6-03 | Plant size: 10 MW | 1 site · On-site 3-21 days | for verified buyers |
Specifications
| Plant size | 1 MW to 10 MW (see variants) |
|---|---|
| Scope | Complete SAT with performance testmade to order: Electrical pre-commissioning / Solar SAT |
| Instruments | Relay test set, IV tracer, CRMmade to order: Insulation tester, earth tester |
| Test sequence | Visual, mechanical, electricalmade to order: Per client approved format |
| Team | Team of 6 with leadmade to order: Test engineer plus 2 technicians |
| Duration on site | 3-5 daysmade to order: 10 days / 3 weeks |
| Reports | Test results on approved formatsmade to order: Digital dossier with photos |
| Calibration | NABL traceablemade to order: Calibration certificates attached |
| Witnessed by | Client engineer |
| Retest policy | Chargedmade to order: One retest included |
| Payment | 50% advance |