Catalogue / Cabling, trenching & HDD works
Cable trenching and laying for power and control cables, Eco seriesSample
by Shaktimax Technical Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Shaktimax Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Cable trenching and laying for power and control cables from Shaktimax, Eco series: 3 cable route length options between 1 km and 5 km. Highlights: drum handling and pulling tension control, HDD bore log and as-built survey and utility locating before excavation. Used by renewable plant internal networks, railway and highway crossings and urban distribution upgrades. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Shaktimax
- Model
- SHA-B54 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Mobilisation in 7 days
- Warranty
- Workmanship 12 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length1 kmSHA-B54-01 | Cable route length: 1 km | 1 km · Mobilisation in 7 days | for verified buyers |
| Cable route length2 kmSHA-B54-02 | Cable route length: 2 km | 1 km · Mobilisation in 7 days | for verified buyers |
| Cable route length5 kmSHA-B54-03 | Cable route length: 5 km | 1 km · Mobilisation in 7 days | for verified buyers |
Specifications
| Cable route length | 1 km to 5 km (see variants) |
|---|---|
| Method | Trench plus HDD for crossings |
| HDD capacity | Up to 250 mm bore |
| Trench depth | 1.2 mmade to order: 0.9 m / 1.5 m |
| Cable type | 11/33 kV XLPE |
| Jointing | Heat shrink |
| Restoration | Backfill and compaction only |
| Permissions | Client arranges |
| Testing | Insulation and VLF test |
| Productivity | 50 m per day HDDmade to order: 300 m per day open trench |
| Crew | Trenching team of 15made to order: HDD crew of 8 with rig |