Catalogue / Installation & erection
Turbine tower and nacelle erection support, Neo seriesSample
by Shaktimax Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Shaktimax Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Turbine tower and nacelle erection support from Shaktimax, Neo series: 4 installation scope options between 1 MW and 25 MW. Highlights: module handling to avoid micro-cracks, torque-verified structure and module fixing and material reconciliation reports. Used by hybrid projects, wind farm substations and c&I rooftop and ground mount. Delivered in line with IS 732 (Electrical Wiring), IEC 62548 and CEA (Measures relating to Safety) Regulations. Mobilisation Mobilisation in 10 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Shaktimax
- Model
- SHA-C46 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Mobilisation in 10 days
- Warranty
- Workmanship 12 months
- Standards
- IS 732 (Electrical Wiring), IEC 62548, CEA (Measures relating to Safety) Regulations
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installation scope1 MWSHA-C46-01 | Installation scope: 1 MW | 1 MW · Mobilisation in 10 days | on quote |
| Installation scope5 MWSHA-C46-02 | Installation scope: 5 MW | 1 MW · Mobilisation in 10 days | on quote |
| Installation scope10 MWSHA-C46-03 | Installation scope: 10 MW | 1 MW · Phased by block | on quote |
| Installation scope25 MWSHA-C46-04 | Installation scope: 25 MW | 1 MW · Phased by block | on quote |
Specifications
| Installation scope | 1 MW to 25 MW (see variants) |
|---|---|
| Scope | Structure and module installation |
| Manpower deployed | 25 technicians per MW-block |
| Supervision | Project manager, engineers, QA/QCmade to order: Site engineer and safety officer |
| Equipment | Pile driver, crane, telehandlermade to order: Own cranes and erection tools |
| Quality plan | ISO 9001 QAP with hold points |
| Safety | Daily toolbox talks, PPE, permits |
| Licence | Class A contractor registrationmade to order: Electrical contractor licence |
| Insurance | CAR, WC and third-party liability |
| Reporting | Daily progress report |
| Payment terms | Milestone based with 10% retention |