Catalogue / Solar & wind BoP construction

No photo yet

Wind farm BoP and internal electrical works, Duo 9 seriesSample

by Shaktimax Technical Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Shaktimax Technical Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Duo 9 service of wind farm BoP and internal electrical works by Shaktimax covers 6 project size options (10 MW to 400 MW). Highlights: cable route survey and marking, cable tray and glanding workmanship and trench depth and sand bedding as per standard. Suited to IPPs managing multiple packages, EPC contractors subcontracting BoP and c&I ground mount. Delivered in line with IS 7098 (XLPE Cables), IEC 62548 and IS 3043 (Earthing). Mobilisation Mobilisation in 14 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Shaktimax
Model
SHA-8C8 series
Listing type
Service
Unit
MW
Minimum order
1 MW
Lead time
Mobilisation in 14 days
Warranty
Defect liability 24 months
Standards
IS 7098 (XLPE Cables), IEC 62548, IS 3043 (Earthing)
Delivers to
South India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Project size10 MWSHA-8C8-01Project size: 10 MW1 MW · Mobilisation in 14 dayson quote
Project size25 MWSHA-8C8-02Project size: 25 MW1 MW · Mobilisation in 14 dayson quote
Project size50 MWSHA-8C8-03Project size: 50 MW1 MW · Mobilisation in 14 dayson quote
Project size100 MWSHA-8C8-04Project size: 100 MW1 MW · Mobilisation in 14 dayson quote
Project size200 MWSHA-8C8-05Project size: 200 MW1 MW · 3-9 months executionon quote
Project size400 MWSHA-8C8-06Project size: 400 MW1 MW · 3-9 months executionon quote

Specifications

Project size10 MW to 400 MW (see variants)
ScopeComplete BoP except modulesmade to order: Cabling and earthing / Civil plus electrical BoP
DC cables4 sq mm solar cablemade to order: 6 sq mm solar cable
MV cables33 kV XLPE Al armoured
Inverter stationSkid or containerisedmade to order: Brick built room
Lightning protectionESE systemmade to order: Franklin rod with mast
Crew size80 persons
EquipmentTrenchers, cranes, excavatorsmade to order: Own fleet
QualityQAP with stage inspectionmade to order: Megger and continuity records
Duration6-9 months
PaymentMilestone based

BARREL: Bharat Atom Renewable Resources Energy Limited