Catalogue / Solar & wind BoP construction
Wind farm BoP and internal electrical works, Duo 9 seriesSample
by Shaktimax Technical Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Shaktimax Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Duo 9 service of wind farm BoP and internal electrical works by Shaktimax covers 6 project size options (10 MW to 400 MW). Highlights: cable route survey and marking, cable tray and glanding workmanship and trench depth and sand bedding as per standard. Suited to IPPs managing multiple packages, EPC contractors subcontracting BoP and c&I ground mount. Delivered in line with IS 7098 (XLPE Cables), IEC 62548 and IS 3043 (Earthing). Mobilisation Mobilisation in 14 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Shaktimax
- Model
- SHA-8C8 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Mobilisation in 14 days
- Warranty
- Defect liability 24 months
- Standards
- IS 7098 (XLPE Cables), IEC 62548, IS 3043 (Earthing)
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Project size10 MWSHA-8C8-01 | Project size: 10 MW | 1 MW · Mobilisation in 14 days | on quote |
| Project size25 MWSHA-8C8-02 | Project size: 25 MW | 1 MW · Mobilisation in 14 days | on quote |
| Project size50 MWSHA-8C8-03 | Project size: 50 MW | 1 MW · Mobilisation in 14 days | on quote |
| Project size100 MWSHA-8C8-04 | Project size: 100 MW | 1 MW · Mobilisation in 14 days | on quote |
| Project size200 MWSHA-8C8-05 | Project size: 200 MW | 1 MW · 3-9 months execution | on quote |
| Project size400 MWSHA-8C8-06 | Project size: 400 MW | 1 MW · 3-9 months execution | on quote |
Specifications
| Project size | 10 MW to 400 MW (see variants) |
|---|---|
| Scope | Complete BoP except modulesmade to order: Cabling and earthing / Civil plus electrical BoP |
| DC cables | 4 sq mm solar cablemade to order: 6 sq mm solar cable |
| MV cables | 33 kV XLPE Al armoured |
| Inverter station | Skid or containerisedmade to order: Brick built room |
| Lightning protection | ESE systemmade to order: Franklin rod with mast |
| Crew size | 80 persons |
| Equipment | Trenchers, cranes, excavatorsmade to order: Own fleet |
| Quality | QAP with stage inspectionmade to order: Megger and continuity records |
| Duration | 6-9 months |
| Payment | Milestone based |