Catalogue / Civil & foundation works
Pre-cast and cast-in-situ foundations for transformers, Pro seriesSample
by Shaktimax Technical Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Shaktimax Technical Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Pre-cast and cast-in-situ foundations for transformers from Shaktimax, Pro series: 3 works volume options between 25 MW equivalent and 100 MW equivalent. Key features: cube and pile test records, local labour employed where possible and waterproofing for cable trenches. Typically used for substations and control rooms, industrial plants and wind farms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation 4-12 weeks execution; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Shaktimax
- Model
- SHA-479 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- 4-12 weeks execution
- Warranty
- Pile load test certified
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume25 MW equivalentSHA-479-01 | Works volume: 25 MW equivalent | 1 job · 4-12 weeks execution | for verified buyers |
| Works volume50 MW equivalentSHA-479-02 | Works volume: 50 MW equivalent | 1 job · 4-12 weeks execution | for verified buyers |
| Works volume100 MW equivalentSHA-479-03 | Works volume: 100 MW equivalent | 1 job · 4-12 weeks execution | for verified buyers |
Specifications
| Works volume | 25 MW equivalent to 100 MW equivalent (see variants) |
|---|---|
| Foundation type | Ramming or screw pile |
| Concrete grade | M40 for turbine foundationmade to order: M25 / M30 |
| Pull-out testing | 2% piles tested |
| Reinforcement | Fe 500D TMTmade to order: Fe 550D |
| Roads and drainage | Not includedmade to order: Murram road, 4 m wide / WBM road with culverts |
| Boundary | Compound wall with barbed wire |
| Quality | Cube test reports per pourmade to order: NABL lab testing of materials |
| Machinery | Batching plant at site |
| Duration | 3-6 monthsmade to order: 4-8 weeks |
| Payment terms | Measured running billsmade to order: Item rate with retention |