Catalogue / Testing & commissioning

No photo yet

Protection relay testing and settings, Duo 6 seriesSample

by Shaktimax Technical Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Shaktimax Technical Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Shaktimax Duo 6 protection relay testing and settings, offered in 3 plant capacity options from 10 MW to 50 MW. Highlights: test formats agreed before mobilisation, live relay setting verification and handover training to O&M team. Suited to EPC handover to owners, lender completion tests and DISCOM and STU charging. Delivered in line with IEC 62446-1, IEC 61724-1 and CEA (Technical Standards for Connectivity) Regulations. Mobilisation Mobilisation in 5 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Shaktimax
Model
SHA-A85 series
Listing type
Service
Unit
MW
Minimum order
1 MW
Lead time
Mobilisation in 5 days
Warranty
Retest at no cost if failure traced to test error
Standards
IEC 62446-1, IEC 61724-1, CEA (Technical Standards for Connectivity) Regulations
Delivers to
South India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity10 MWSHA-A85-01Plant capacity: 10 MW1 MW · Mobilisation in 5 dayson quote
Plant capacity25 MWSHA-A85-02Plant capacity: 25 MW1 MW · Mobilisation in 5 dayson quote
Plant capacity50 MWSHA-A85-03Plant capacity: 50 MW1 MW · Mobilisation in 5 dayson quote

Specifications

Plant capacity10 MW to 50 MW (see variants)
Tests coveredTransformer, switchgear, relay tests
InstrumentsRelay test set, thermal camera
CalibrationCalibration valid at test datemade to order: NABL traceable certificates
TeamLead plus 5 member crew
Statutory supportCEIG inspection coordination
ReportsTest reports with signed formats
Duration on site5-7 days
Performance guarantee test72-hour trial run
Grid code checksNot includedmade to order: Reactive power and ramp rate
Payment50% on start, 50% on reportmade to order: Milestone on energisation

BARREL: Bharat Atom Renewable Resources Energy Limited