Catalogue / Live-line & hot-line washing
Substation insulator hot washing, Elite seriesSample
by Shaktitek Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Shaktitek Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Shaktitek Elite substation insulator hot washing, offered in 3 voltage level options from 11 kV to 66 kV. Key features: pre-wash contamination assessment, weather window planning and utility permit coordination. Used by coastal and industrial pollution zones, substations in dusty regions and utility transmission networks. Delivered in line with IEC 60815, CEA (Measures relating to Safety) Regulations and IEEE 957. Mobilisation Permit based scheduling; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Shaktitek
- Model
- SHA-AF7 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- Permit based scheduling
- Warranty
- As per contract
- Standards
- IEC 60815, CEA (Measures relating to Safety) Regulations, IEEE 957
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Voltage level11 kVSHA-AF7-01 | Voltage level: 11 kV | 1 job · Permit based scheduling | on quote |
| Voltage level33 kVSHA-AF7-02 | Voltage level: 33 kV | 1 job · Permit based scheduling | on quote |
| Voltage level66 kVSHA-AF7-03 | Voltage level: 66 kV | 1 job · Permit based scheduling | on quote |
Specifications
| Voltage level | 11 kV to 66 kV (see variants) |
|---|---|
| Method | Pressurised water jet |
| Resistivity of water | Demineralised water |
| Scope | Per km of linemade to order: Per tower / Per bay |
| Frequency | Pre-monsoon |
| Crew | Linemen with insulated platform |
| Tools | Bucket with insulated boom |
| Safety | Shutdown not required |
| Outputs | Pre and post leakage currentmade to order: Photo log of insulators |
| Productivity | 30 towers per day |
| Licence | Authorised live-line workersmade to order: Trained under utility protocols |