Catalogue / Transformer overhaul & oil filtration

No photo yet

On-site core and winding inspection, Duo 9 seriesSample

by Shaktitek Infra Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Shaktitek Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Shaktitek Duo 9 on-site core and winding inspection, offered in 4 transformer rating options from 5 MVA to 50 MVA. Key features: oil sampling and DGA before work, nitrogen or dry air purge on opening and leak testing before energisation. Used by solar and wind pooling substations, captive power plants and state utility asset life extension. Delivered in line with IS 335 (Mineral Insulating Oil), IS 1866 (Oil Maintenance) and IEC 60422. Mobilisation Planned shutdown required; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Shaktitek
Model
SHA-1C1 series
Listing type
Service
Unit
nos
Minimum order
1 nos
Lead time
Planned shutdown required
Warranty
Oil quality guarantee 6 months
Standards
IS 335 (Mineral Insulating Oil), IS 1866 (Oil Maintenance), IEC 60422
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Transformer rating5 MVASHA-1C1-01Transformer rating: 5 MVA1 nos · Planned shutdown requiredon quote
Transformer rating10 MVASHA-1C1-02Transformer rating: 10 MVA1 nos · Planned shutdown requiredon quote
Transformer rating20 MVASHA-1C1-03Transformer rating: 20 MVA1 nos · Planned shutdown requiredon quote
Transformer rating50 MVASHA-1C1-04Transformer rating: 50 MVA1 nos · Planned shutdown requiredon quote

Specifications

Transformer rating5 MVA to 50 MVA (see variants)
ServiceInternal inspection and overhaulmade to order: Oil filtration and dehydration / Oil reclamation / Full overhaul with rewinding
Filtration machineVacuum dehydration 6000 L/hrmade to order: Mobile 12000 L/hr
Oil BDV targetAbove 60 kVmade to order: Above 70 kV
Moisture targetBelow 5 ppm
TestingDGA, furan, BDV, tan deltamade to order: Full routine tests after overhaul
SparesBushings and OLTC parts at cost
Downtime5-7 daysmade to order: 2-3 days / 3-4 weeks
Site workHot oil circulation at site
Crew4 technicians with supervisor
CertificateOverhaul report with test data

BARREL: Bharat Atom Renewable Resources Energy Limited