Industrial water-tube boiler, Eco seriesSample
by Shivaliklumen Power Plant Equipment (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Shivaliklumen Power Plant Equipment (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Eco range of industrial water-tube boiler by Shivaliklumen covers 3 steam capacity options (35 TPH to 150 TPH). Highlights: IBR-approved design and pressure parts, meets CPCB norms with ESP or FGD and low NOx combustion system. Used by utility thermal power stations, cogeneration and captive power plants. Designed and tested to IBR 1950, IS 2825 and ASME Sec I. Lead time 18-26 months; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Shivaliklumen
- Model
- SHI-B29 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 18-26 months
- Warranty
- 12 months
- Standards
- IBR 1950, IS 2825, ASME Sec I
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Drum / reel with end caps
- Delivery terms
- Door delivery in metro cities
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Steam capacity35 TPHSHI-B29-01 | Steam capacity: 35 TPH | 1 nos · 18-26 months | for verified buyers |
| Steam capacity75 TPHSHI-B29-02 | Steam capacity: 75 TPH | 1 nos · 18-26 months | for verified buyers |
| Steam capacity150 TPHSHI-B29-03 | Steam capacity: 150 TPH | 1 nos · 18-26 months | for verified buyers |
Specifications
| Steam capacity | 35 TPH to 150 TPH (see variants) |
|---|---|
| Boiler type | CFBC |
| Steam pressure | 45 barmade to order: 67 bar / 110 bar / 170 bar |
| Steam temperature | 540 C |
| Fuel | Biomassmade to order: Coal / Gas / Lignite |
| Circulation | Assistedmade to order: Natural |
| Design code | ASMEmade to order: IBR |
| Efficiency | 89%made to order: 84% / 87% |
| Air preheater | Tubular |
| Emission control | Bag filtermade to order: ESP / FGD ready |
| Control | DCS |