Catalogue / Fuel oil & firing systems
Burner management system, Prime 2 seriesSample
by Shivaliklumen Power Plant Equipment (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Shivaliklumen Power Plant Equipment (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Prime 2 range of burner management system by Shivaliklumen covers 6 burner capacity options (500 kg/h to 10000 kg/h). Design: compliant with NFPA 85, heat-traced piping for heavy fuel and low-excess-air operation. Suited to thermal power plants, boiler start-up and flame stabilisation and captive boilers. Designed and tested to IS 12665, NFPA 85 and IBR 1950. Lead time 12-16 weeks; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Shivaliklumen
- Model
- SHI-5A2 series
- Listing type
- Product
- Unit
- set
- Minimum order
- 5 set
- Lead time
- 12-16 weeks
- Warranty
- 12 months
- Standards
- IS 12665, NFPA 85, IBR 1950
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Wooden crate, seaworthy
- Delivery terms
- Door delivery in metro cities
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Burner capacity500 kg/hSHI-5A2-01 | Burner capacity: 500 kg/h | 5 set · 12-16 weeks | on quote |
| Burner capacity1000 kg/hSHI-5A2-02 | Burner capacity: 1000 kg/h | 5 set · 12-16 weeks | on quote |
| Burner capacity2000 kg/hSHI-5A2-03 | Burner capacity: 2000 kg/h | 5 set · 12-16 weeks | on quote |
| Burner capacity4000 kg/hSHI-5A2-04 | Burner capacity: 4000 kg/h | 5 set · 12-16 weeks | on quote |
| Burner capacity6000 kg/hSHI-5A2-05 | Burner capacity: 6000 kg/h | 5 set · 12-16 weeks | on quote |
| Burner capacity10000 kg/hSHI-5A2-06 | Burner capacity: 10000 kg/h | 5 set · 12-16 weeks | on quote |
Specifications
| Burner capacity | 500 kg/h to 10000 kg/h (see variants) |
|---|---|
| Fuel | Gas |
| Atomisation | Mechanicalmade to order: Steam / Air |
| Turndown | 4:1made to order: 6:1 |
| Heater | Electric |
| Pump type | Gear |
| Filter | Duplex strainer |
| Flame monitoring | IR scanner |
| Control | BMS with PLC |
| Ignition | HEA electric |
| Fuel temperature | 120 Cmade to order: 105 C |
| Safety | Double block and bleed |