Catalogue / Substation automation (IEC 61850)

No photo yet

IEC 61850 substation automation system, Eco seriesSample

by Shivalik Protection Systems (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Shivalik Protection Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Eco range of IEC 61850 substation automation system by Shivalik covers 4 bays options (Up to 8 bays to Up to 64 bays). Design: interoperable multi-vendor bay devices, redundant network with zero-recovery time and fully tested using IEC 61850 configurator. Suited to solar pooling stations, industrial plants and metro traction. Designed and tested to IEC 61850, IEC 62351 and IEC 60870-5-104. Lead time 16-24 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Shivalik
Model
SHI-A59 series
Listing type
Product
Unit
lot
Minimum order
2 lot
Lead time
16-24 weeks
Warranty
36 months
Standards
IEC 61850, IEC 62351, IEC 60870-5-104
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
Wooden crate, seaworthy
Delivery terms
FOR site, freight included
Returns
Replacement of items damaged in transit within 7 days
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
BaysUp to 8 baysSHI-A59-01Bays: Up to 8 bays2 lot · 16-24 weekson quote
BaysUp to 16 baysSHI-A59-02Bays: Up to 16 bays2 lot · 16-24 weekson quote
BaysUp to 32 baysSHI-A59-03Bays: Up to 32 bays2 lot · 16-24 weekson quote
BaysUp to 64 baysSHI-A59-04Bays: Up to 64 bays2 lot · 16-24 weekson quote

Specifications

BaysUp to 8 bays to Up to 64 bays (see variants)
ArchitectureStation + process bus
ProtocolIEC 61850 Ed 2
Network topologyHSR ringmade to order: Dual star / PRP
HMIRedundant serversmade to order: Single HMI
Time syncGPS with PTPmade to order: SNTP
GatewayRedundant to RLDC / SLDC
Cyber-securityFirewall, IEC 62351, NERC style
HistorianIncluded, 5 years data
Engineering toolConfiguration software
Network switchesIndustrial managed
Auxiliary supply220 V DCmade to order: 110 V DC
TestingFAT + SAT

BARREL: Bharat Atom Renewable Resources Energy Limited