Numerical feeder protection relay, Plus 3 seriesSample
by Shivalik Protection Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Shivalik Protection Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Shivalik Plus 3 numerical feeder protection relay, offered in 6 function options from Overcurrent / earth fault to Busbar differential. Design: graphical logic programming, front USB and rear Ethernet ports and event and fault recorder with 1 ms stamps. Suited to solar plant collector feeders, transformer bays and industrial incomers. Designed and tested to IEC 60255, IEC 61850 and IS 3231. Lead time 3-6 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Shivalik
- Model
- SHI-C42 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 5 nos
- Lead time
- 3-6 weeks
- Warranty
- 36 months
- Standards
- IEC 60255, IEC 61850, IS 3231
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Wooden crate, seaworthy
- Delivery terms
- Door delivery in metro cities
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| FunctionOvercurrent / earth faultSHI-C42-01 | Function: Overcurrent / earth fault | 5 nos · 3-6 weeks | for verified buyers |
| FunctionMotor protectionSHI-C42-02 | Function: Motor protection | 5 nos · 3-6 weeks | for verified buyers |
| FunctionFeeder protectionSHI-C42-03 | Function: Feeder protection | 5 nos · 3-6 weeks | for verified buyers |
| FunctionTransformer differentialSHI-C42-04 | Function: Transformer differential | 5 nos · 3-6 weeks | for verified buyers |
| FunctionLine distanceSHI-C42-05 | Function: Line distance | 5 nos · 8-10 weeks | for verified buyers |
| FunctionBusbar differentialSHI-C42-06 | Function: Busbar differential | 5 nos · 8-10 weeks | for verified buyers |
Specifications
| Function | Overcurrent / earth fault to Busbar differential (see variants) |
|---|---|
| Aux supply | 110 V DCmade to order: 24-250 V DC / 220 V DC |
| CT input | 1/5 A selectable |
| VT input | 110 V |
| Binary inputs | 32made to order: 8 / 16 |
| Output relays | 6made to order: 12 / 24 |
| Communication | Modbusmade to order: IEC 61850 Ed 2 / IEC 60870-5-103 |
| Display | LCD with keypadmade to order: Graphic LCD |
| Disturbance recorder | Up to 100 records |
| Accuracy class | Class 0.5 metering |
| Case | Draw-outmade to order: Flush mount |
| Time sync | PTPmade to order: SNTP / IRIG-B |
| Cyber-security | Role-based access |