Catalogue / Water testing laboratories
Transformer coolant and make-up water test, Flex 7 seriesSample
by Sudarshangen Water Technologies (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Sudarshangen Water Technologies (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Sudarshangen Flex 7 transformer coolant and make-up water test, offered in 4 parameter panel options from Basic 10 parameters to Heavy metals panel. Highlights: sample retention for query period, interpretation notes provided and report compared with IS limits. Suited to power plant water chemistry, statutory consent compliance and township water quality. Delivered in line with IS 3025, IS 10500 and ISO/IEC 17025. Mobilisation 3-5 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Sudarshangen
- Model
- SUD-308 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- 3-5 days
- Warranty
- Report valid for the sampled lot
- Standards
- IS 3025, IS 10500, ISO/IEC 17025
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Parameter panelBasic 10 parametersSUD-308-01 | Parameter panel: Basic 10 parameters | 1 job · 3-5 days | for verified buyers |
| Parameter panelPhysical and chemical 25SUD-308-02 | Parameter panel: Physical and chemical 25 | 1 job · 3-5 days | for verified buyers |
| Parameter panelFull IS 10500SUD-308-03 | Parameter panel: Full IS 10500 | 1 job · 7-10 days | for verified buyers |
| Parameter panelHeavy metals panelSUD-308-04 | Parameter panel: Heavy metals panel | 1 job · 7-10 days | for verified buyers |
Specifications
| Parameter panel | Basic 10 parameters to Heavy metals panel (see variants) |
|---|---|
| Sample type | Wastewatermade to order: Water / Boiler water / Cooling water |
| Reporting | Digital reportmade to order: Hard copy with seal |
| Accreditation | NABL accredited |
| Turnaround | 7 days |
| Sample volume | 5 litremade to order: 2 litre |
| Collection | Client collected |
| Methods | APHA |
| Sample transport | Chilled |
| Report format | IS 10500 comparisonmade to order: CPCB compliance |