Catalogue / Waste-to-energy (incineration, RDF)
Municipal solid waste incinerator, Core seriesSample
by Suryamax Bioenergy Systems (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Suryamax Bioenergy Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Suryamax Core municipal solid waste incinerator, offered in 3 plant capacity options from 750 TPD to 1500 TPD. Highlights: steam turbine heat recovery, meets CPCB dioxin and furan limits and automated crane and grate control. Used by PPP waste-to-energy developers, urban local bodies and municipal corporations. Designed and tested to SWM Rules 2016, CPCB emission norms and IBR 1950. Lead time 18-24 months; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Suryamax
- Model
- SUR-1E9 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 1 lot
- Lead time
- 18-24 months
- Warranty
- Performance guarantee as per contract
- Standards
- SWM Rules 2016, CPCB emission norms, IBR 1950
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Corrugated box on pallet
- Delivery terms
- FOR nearest railhead
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity750 TPDSUR-1E9-01 | Plant capacity: 750 TPD | 1 lot · 18-24 months | on quote |
| Plant capacity1000 TPDSUR-1E9-02 | Plant capacity: 1000 TPD | 1 lot · 18-24 months | on quote |
| Plant capacity1500 TPDSUR-1E9-03 | Plant capacity: 1500 TPD | 1 lot · 18-24 months | on quote |
Specifications
| Plant capacity | 750 TPD to 1500 TPD (see variants) |
|---|---|
| Technology | Gasification |
| Fuel | Industrial waste |
| Calorific value | 2500 kcal/kg |
| Steam parameters | 67 bar / 485 Cmade to order: 42 bar / 400 C |
| Power output | 20 MW |
| Flue gas cleaning | SNCR, lime, bag filter, activated carbon |
| Residence time | > 2 s at 850 C |
| Ash handling | Wet bottom ash extractor |
| Dioxin control | Activated carbon injection |
| Monitoring | CEMS online to CPCB |
| Design life | 25 years |