Catalogue / Waste-to-energy (incineration, RDF)

No photo yet

Waste-to-energy moving grate system, Max seriesSample

by Suryamax Bioenergy Systems (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Suryamax Bioenergy Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Max range of waste-to-energy moving grate system by Suryamax covers 5 plant capacity options (300 TPD to 1500 TPD). Key features: bottom ash used in brick or road base, odour control through negative pressure bunker and continuous emission monitoring linked to CPCB. Used by PPP waste-to-energy developers, municipal corporations and industrial waste processors. Designed and tested to SWM Rules 2016, CPCB emission norms and IBR 1950. Lead time 24-30 months; delivers to All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Suryamax
Model
SUR-A76 series
Listing type
Product
Unit
lot
Minimum order
1 lot
Lead time
24-30 months
Warranty
Performance guarantee as per contract
Standards
SWM Rules 2016, CPCB emission norms, IBR 1950
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Packaging
Wooden crate, seaworthy
Delivery terms
FOR nearest railhead
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity300 TPDSUR-A76-01Plant capacity: 300 TPD1 lot · 24-30 monthsfor verified buyers
Plant capacity500 TPDSUR-A76-02Plant capacity: 500 TPD1 lot · 24-30 monthsfor verified buyers
Plant capacity750 TPDSUR-A76-03Plant capacity: 750 TPD1 lot · 24-30 monthsfor verified buyers
Plant capacity1000 TPDSUR-A76-04Plant capacity: 1000 TPD1 lot · 24-30 monthsfor verified buyers
Plant capacity1500 TPDSUR-A76-05Plant capacity: 1500 TPD1 lot · 24-30 monthsfor verified buyers

Specifications

Plant capacity300 TPD to 1500 TPD (see variants)
TechnologyGasificationmade to order: Moving grate / Fluidised bed
FuelIndustrial waste
Calorific value1500 kcal/kgmade to order: 2500 kcal/kg / 3200 kcal/kg
Steam parameters42 bar / 400 Cmade to order: 67 bar / 485 C
Power output3 MWmade to order: 10 MW / 20 MW
Flue gas cleaningSNCR, lime, bag filter, activated carbon
Residence time> 2 s at 850 C
Ash handlingWet bottom ash extractor
Dioxin controlActivated carbon injection
MonitoringCEMS online to CPCB
Design life25 years

BARREL: Bharat Atom Renewable Resources Energy Limited