Catalogue / Hot-dip galvanising
Galvanising of fasteners (spin), Xtra seriesSample
by Sutlej Coatings (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Sutlej Coatings (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Galvanising of fasteners (spin) from Sutlej, Xtra series: 3 minimum zinc coating options between 85 micron and 125 micron. Design: coating thickness measured by magnetic gauge, testing certificate with each lot and wash and brush finishing. Suited to transmission towers, cable trays and fencing and substation structures. Delivered in line with IS 4759, IS 2629 and IS 2633. Mobilisation 3-5 days; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Sutlej
- Model
- SUT-289 series
- Listing type
- Service
- Unit
- MT
- Minimum order
- 1 MT
- Lead time
- 3-5 days
- Warranty
- Free re-galvanising for rejected pieces
- Standards
- IS 4759, IS 2629, IS 2633
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Minimum zinc coating85 micronSUT-289-01 | Minimum zinc coating: 85 micron | 1 MT · 3-5 days | on quote |
| Minimum zinc coating100 micronSUT-289-02 | Minimum zinc coating: 100 micron | 1 MT · 3-5 days | on quote |
| Minimum zinc coating125 micronSUT-289-03 | Minimum zinc coating: 125 micron | 1 MT · 3-5 days | on quote |
Specifications
| Minimum zinc coating | 85 micron to 125 micron (see variants) |
|---|---|
| Item type | Structure assembly |
| Max piece length | 12 m |
| Bath size | 12 x 1.5 x 3 mmade to order: 14 x 1.8 x 3.5 m |
| Zinc purity | Prime Westernmade to order: 99.95% |
| Surface prep | Degrease, pickle, flux |
| Post treatment | Chromate passivation |
| Test report | Coating thickness per piecemade to order: Adhesion test |
| Turnaround | 3 daysmade to order: 5 days / 7 days |
| Transport | To and from plant |