Catalogue / Hot-dip galvanising

No photo yet

Galvanising of fasteners (spin), Xtra seriesSample

by Sutlej Coatings (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Sutlej Coatings (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Galvanising of fasteners (spin) from Sutlej, Xtra series: 3 minimum zinc coating options between 85 micron and 125 micron. Design: coating thickness measured by magnetic gauge, testing certificate with each lot and wash and brush finishing. Suited to transmission towers, cable trays and fencing and substation structures. Delivered in line with IS 4759, IS 2629 and IS 2633. Mobilisation 3-5 days; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Sutlej
Model
SUT-289 series
Listing type
Service
Unit
MT
Minimum order
1 MT
Lead time
3-5 days
Warranty
Free re-galvanising for rejected pieces
Standards
IS 4759, IS 2629, IS 2633
Delivers to
North India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Minimum zinc coating85 micronSUT-289-01Minimum zinc coating: 85 micron1 MT · 3-5 dayson quote
Minimum zinc coating100 micronSUT-289-02Minimum zinc coating: 100 micron1 MT · 3-5 dayson quote
Minimum zinc coating125 micronSUT-289-03Minimum zinc coating: 125 micron1 MT · 3-5 dayson quote

Specifications

Minimum zinc coating85 micron to 125 micron (see variants)
Item typeStructure assembly
Max piece length12 m
Bath size12 x 1.5 x 3 mmade to order: 14 x 1.8 x 3.5 m
Zinc purityPrime Westernmade to order: 99.95%
Surface prepDegrease, pickle, flux
Post treatmentChromate passivation
Test reportCoating thickness per piecemade to order: Adhesion test
Turnaround3 daysmade to order: 5 days / 7 days
TransportTo and from plant

BARREL: Bharat Atom Renewable Resources Energy Limited