Catalogue / Grid connectivity & GNA applications
GNA application with CTUIL, Plus seriesSample
by Swarnaline Logistics (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Swarnaline Logistics (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Swarnaline Plus GNA application with CTUIL, offered in 6 capacity applied options from 10 MW to 1000 MW. Highlights: handling of CTU queries, bank guarantee timeline tracking and eligibility check before filing. Typically used for industrial captive generators, storage developers and renewable developers. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Grant 3-9 months; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Swarnaline
- Model
- SWA-B87 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Grant 3-9 months
- Warranty
- Rework of deficient applications
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied10 MWSWA-B87-01 | Capacity applied: 10 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied50 MWSWA-B87-02 | Capacity applied: 50 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied100 MWSWA-B87-03 | Capacity applied: 100 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied250 MWSWA-B87-04 | Capacity applied: 250 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied500 MWSWA-B87-05 | Capacity applied: 500 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied1000 MWSWA-B87-06 | Capacity applied: 1000 MW | 1 application · Grant 3-9 months | for verified buyers |
Specifications
| Capacity applied | 10 MW to 1000 MW (see variants) |
|---|---|
| Application | Bothmade to order: Connectivity / GNA |
| Scope | End-to-end liaison |
| Bank guarantee | Arranged by clientmade to order: Arranged through partner bank |
| Studies | Grid impact summarymade to order: Detailed power system study |
| Portal handling | CTUIL portal |
| Team | Regulatory lead and engineermade to order: Dedicated manager |
| Timeline | Approval 3-6 monthsmade to order: Filing in 2 weeks |
| Technical documents | Switchyard layout and GA drawingsmade to order: SLD, land proof, board resolution |
| Queries | Until grantmade to order: Responded within 2 days |
| Fee basis | Fixed |