Catalogue / Waste-to-energy (incineration, RDF)

No photo yet

Municipal solid waste incinerator, Neo 5 seriesSample

by Swarnatek Bio Energy (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Swarnatek Bio Energy (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Swarnatek Neo 5 municipal solid waste incinerator, offered in 4 plant capacity options from 100 TPD to 750 TPD. Highlights: continuous emission monitoring linked to CPCB, meets CPCB dioxin and furan limits and steam turbine heat recovery. Typically used for urban local bodies, municipal corporations and industrial waste processors. Designed and tested to SWM Rules 2016, CPCB emission norms and IBR 1950. Lead time 24-30 months; delivers to East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Swarnatek
Model
SWA-1E9 series
Listing type
Product
Unit
lot
Minimum order
5 lot
Lead time
24-30 months
Warranty
24 months
Standards
SWM Rules 2016, CPCB emission norms, IBR 1950
Delivers to
East & North-East India
GST rate
18 %
Country of origin
India
Packaging
Corrugated box on pallet
Delivery terms
FOR site, freight included
Returns
Replacement of items damaged in transit within 7 days
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Plant capacity100 TPDSWA-1E9-01Plant capacity: 100 TPD5 lot · 24-30 monthsfor verified buyers
Plant capacity300 TPDSWA-1E9-02Plant capacity: 300 TPD5 lot · 24-30 monthsfor verified buyers
Plant capacity500 TPDSWA-1E9-03Plant capacity: 500 TPD5 lot · 24-30 monthsfor verified buyers
Plant capacity750 TPDSWA-1E9-04Plant capacity: 750 TPD5 lot · 24-30 monthsfor verified buyers

Specifications

Plant capacity100 TPD to 750 TPD (see variants)
TechnologyFluidised bedmade to order: Moving grate / Gasification
FuelIndustrial waste
Calorific value1500 kcal/kgmade to order: 2500 kcal/kg / 3200 kcal/kg
Steam parameters67 bar / 485 Cmade to order: 42 bar / 400 C
Power output20 MW
Flue gas cleaningSNCR, lime, bag filter, activated carbon
Residence time> 2 s at 850 C
Ash handlingWet bottom ash extractor
Dioxin controlActivated carbon injection
MonitoringCEMS online to CPCB
Design life25 years

BARREL: Bharat Atom Renewable Resources Energy Limited