Catalogue / Resource assessment (solar, wind, hydro)
Satellite based long-term solar irradiance study, Elite 3 seriesSample
by Tamraline Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Tamraline Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Elite 3 service of satellite based long-term solar irradiance study by Tamraline covers 3 measurement duration options (3 months to 12 months). Highlights: loss factors for local conditions, extreme wind and wake studies and data quality control and filling. Used by wind and solar developers, hybrid project planners and lenders needing P90. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Campaign 3-24 months; serves West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Tamraline
- Model
- TAM-B55 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Campaign 3-24 months
- Warranty
- As per contract
- Standards
- IEC 61400-12-1, IEC 61724-1, IEC 61400-15
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Measurement duration3 monthsTAM-B55-01 | Measurement duration: 3 months | 1 report · Campaign 3-24 months | on quote |
| Measurement duration6 monthsTAM-B55-02 | Measurement duration: 6 months | 1 report · Campaign 3-24 months | on quote |
| Measurement duration12 monthsTAM-B55-03 | Measurement duration: 12 months | 1 report · Campaign 3-24 months | on quote |
Specifications
| Measurement duration | 3 months to 12 months (see variants) |
|---|---|
| Technology | Windmade to order: Solar GHI/DNI / Small hydro |
| Data source | Satellite and reanalysismade to order: On-site measurement / Hybrid with MCP |
| Equipment | 80-120 m met mast with LiDARmade to order: Class A pyranometer station |
| Uncertainty | P50/P90 with uncertainty budgetmade to order: Bankable assessment |
| Modelling | WAsP, WindPRO |
| Deliverable | Hourly time series dataset |
| Calibration | Calibration pre and post campaignmade to order: Traceable calibration |
| Site count | Single sitemade to order: Multi-site comparison |
| Maintenance | Remote health checks |
| Turnaround | Report within 6 weeks of datamade to order: Report in 3 weeks |