Catalogue / Boiler & turbine spares
Steam turbine rotor refurbishment, Max 4 seriesSample
by Taptiakshay Thermal Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Taptiakshay Thermal Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Steam turbine rotor refurbishment from Taptiakshay, Max 4 series: 5 unit size options between 10 MW and 210 MW. Key features: manufactured to OEM drawings, quick turnaround for forced outages and NDT reports on every set. Suited to captive plant O&M, forced outage recovery and overhaul of thermal units. Designed and tested to IBR 1950, ASTM A213 and ASTM A210. Lead time 12-20 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Taptiakshay
- Model
- TAP-C89 series
- Listing type
- Product
- Unit
- set
- Minimum order
- 5 set
- Lead time
- 12-20 weeks
- Warranty
- 18 months
- Standards
- IBR 1950, ASTM A213, ASTM A210
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Packaging
- Drum / reel with end caps
- Delivery terms
- FOR nearest railhead
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Unit size10 MWTAP-C89-01 | Unit size: 10 MW | 5 set · 12-20 weeks | for verified buyers |
| Unit size30 MWTAP-C89-02 | Unit size: 30 MW | 5 set · 12-20 weeks | for verified buyers |
| Unit size60 MWTAP-C89-03 | Unit size: 60 MW | 5 set · 12-20 weeks | for verified buyers |
| Unit size120 MWTAP-C89-04 | Unit size: 120 MW | 5 set · 12-20 weeks | for verified buyers |
| Unit size210 MWTAP-C89-05 | Unit size: 210 MW | 5 set · 12-20 weeks | for verified buyers |
Specifications
| Unit size | 10 MW to 210 MW (see variants) |
|---|---|
| Component | Turbine bladesmade to order: Boiler tubes / Superheater / Mill spares |
| Tube material | SA 213 T22made to order: SA 210 A1 / SA 213 T91 |
| Blade material | 12Cr |
| OEM compatibility | Compatible |
| Surface treatment | HVOF coatingmade to order: Stellite shielding |
| Testing | Hydro, UT, DP |
| Dimensional tolerance | As per OEM drawing |
| Heat treatment | Normalised and tempered |
| Documentation | MTC and NDT reports |
| Condition | Newmade to order: Refurbished |