Catalogue / Power system studies (load flow, short circuit, grid code)
Dynamic stability and fault ride-through study, Ultra 8 seriesSample
by Taptideep Projects (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Taptideep Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Dynamic stability and fault ride-through study from Taptideep, Ultra 8 series: 4 network scale options between 66 kV system and 400 kV system. Design: PSS/E and PSCAD model support, reactive power capability curves and fault level verification of switchgear. Typically used for utilities and consultants, renewable developers seeking connectivity and BESS integrators. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code and IEEE 1547. Mobilisation Kick-off in 1 week; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Taptideep
- Model
- TAP-5E5 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Kick-off in 1 week
- Warranty
- Revision for utility comments
- Standards
- CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code, IEEE 1547
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Network scale66 kV systemTAP-5E5-01 | Network scale: 66 kV system | 1 report · Kick-off in 1 week | for verified buyers |
| Network scale132 kV systemTAP-5E5-02 | Network scale: 132 kV system | 1 report · Kick-off in 1 week | for verified buyers |
| Network scale220 kV systemTAP-5E5-03 | Network scale: 220 kV system | 1 report · 2-6 weeks | for verified buyers |
| Network scale400 kV systemTAP-5E5-04 | Network scale: 400 kV system | 1 report · 2-6 weeks | for verified buyers |
Specifications
| Network scale | 66 kV system to 400 kV system (see variants) |
|---|---|
| Study type | Harmonics |
| Software | DIgSILENT PowerFactory |
| Model data | Utility network modelmade to order: Client single line diagram and data |
| Deliverables | Study report with resultsmade to order: Model files and relay settings |
| Grid code checks | LVRT/HVRT and ramp ratemade to order: Voltage and reactive power capability |
| Review | Lender review |
| Scenarios | Normal and N-1 |
| Team | Power system engineermade to order: Lead plus modelling specialist |
| Turnaround | 2-3 weeks |
| Validation | Peer reviewmade to order: Compared with measured data |