Catalogue / Resource assessment (solar, wind, hydro)
Satellite based long-term solar irradiance study, Flex seriesSample
by Taptideep Projects (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Taptideep Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Taptideep Flex satellite based long-term solar irradiance study, offered in 3 measurement duration options from 12 months to 24 months. Design: long-term correction using reference data, data quality control and filling and independent bankable estimate. Suited to hybrid project planners, state agencies mapping resource and wind and solar developers. Delivered in line with IEC 61400-12-1, IEC 61724-1 and IEC 61400-15. Mobilisation Desktop in 2-3 weeks; serves East & North-East India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Taptideep
- Model
- TAP-B59 series
- Listing type
- Service
- Unit
- report
- Minimum order
- 1 report
- Lead time
- Desktop in 2-3 weeks
- Warranty
- As per contract
- Standards
- IEC 61400-12-1, IEC 61724-1, IEC 61400-15
- Delivers to
- East & North-East India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Measurement duration12 monthsTAP-B59-01 | Measurement duration: 12 months | 1 report · Desktop in 2-3 weeks | for verified buyers |
| Measurement duration18 monthsTAP-B59-02 | Measurement duration: 18 months | 1 report · Desktop in 2-3 weeks | for verified buyers |
| Measurement duration24 monthsTAP-B59-03 | Measurement duration: 24 months | 1 report · Desktop in 2-3 weeks | for verified buyers |
Specifications
| Measurement duration | 12 months to 24 months (see variants) |
|---|---|
| Technology | Solar GHI/DNI |
| Data source | Hybrid with MCPmade to order: Satellite and reanalysis / On-site measurement |
| Equipment | 80-120 m met mast with LiDARmade to order: Class A pyranometer station |
| Uncertainty | Bankable assessmentmade to order: P50/P90 with uncertainty budget |
| Modelling | PVsyst, SAMmade to order: WAsP, WindPRO |
| Deliverable | Hourly time series datasetmade to order: Resource report |
| Calibration | Calibration pre and post campaign |
| Site count | Multi-site comparisonmade to order: Single site |
| Maintenance | Remote health checksmade to order: Quarterly site visit |
| Turnaround | Report within 6 weeks of datamade to order: Report in 3 weeks |