Tarangline Elite cable and earthing design package, offered in 6 plant capacity options from 5 MW to 250 MW. Key features: as-built drawing update after commissioning, yield and loss modelling aligned to bankable reports and compliant with state grid code requirements. Suited to EPC contractors bidding for projects, IPPs and developers and lender technical reviews. Delivered in line with CEA (Technical Standards for Connectivity) Regulations, IEC 62548 and IS 3043 (Earthing). Mobilisation 3-4 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Tarangline
- Model
- TAR-AE8 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- 3-4 weeks
- Warranty
- As per contract
- Standards
- CEA (Technical Standards for Connectivity) Regulations, IEC 62548, IS 3043 (Earthing)
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Plant capacity5 MWTAR-AE8-01 | Plant capacity: 5 MW | 1 job · 3-4 weeks | for verified buyers |
| Plant capacity10 MWTAR-AE8-02 | Plant capacity: 10 MW | 1 job · 3-4 weeks | for verified buyers |
| Plant capacity25 MWTAR-AE8-03 | Plant capacity: 25 MW | 1 job · 3-4 weeks | for verified buyers |
| Plant capacity50 MWTAR-AE8-04 | Plant capacity: 50 MW | 1 job · 3-4 weeks | for verified buyers |
| Plant capacity100 MWTAR-AE8-05 | Plant capacity: 100 MW | 1 job · 6-10 weeks | for verified buyers |
| Plant capacity250 MWTAR-AE8-06 | Plant capacity: 250 MW | 1 job · 6-10 weeks | for verified buyers |
Specifications
| Plant capacity | 5 MW to 250 MW (see variants) |
|---|---|
| Deliverables | Full IFC drawing set with calculationsmade to order: GA drawings, SLD, BoQ / Design basis report plus drawings |
| Design software | PVsyst, STAAD, ETAP, Civil 3D |
| Team | Lead engineer plus 3 designers |
| Turnaround | 3-4 weeks |
| Revisions included | 2 roundsmade to order: 3 rounds / Unlimited until approval |
| Authority submission support | CEA/CEIG drawing approval |
| Earthing and LA study | Optional add-on |
| Format | PDF, CAD and BIM modelmade to order: PDF and native CAD |
| Site visit | One visit included |
| Payment milestones | 30% advance, 40% on drafts, 30% on IFC |