Catalogue / Installation & erection
Cable laying, termination and earthing installation, Prime seriesSample
by Tarangline Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Tarangline Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Cable laying, termination and earthing installation from Tarangline, Prime series: 4 installation scope options between 25 MW and 200 MW. Design: torque-verified structure and module fixing, punch list closure before testing and cable route marking and tray fixing. Typically used for hybrid projects, c&I rooftop and ground mount and wind farm substations. Delivered in line with IS 732 (Electrical Wiring), IEC 62548 and CEA (Measures relating to Safety) Regulations. Mobilisation Phased by block; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Tarangline
- Model
- TAR-DD7 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Phased by block
- Warranty
- Workmanship 12 months
- Standards
- IS 732 (Electrical Wiring), IEC 62548, CEA (Measures relating to Safety) Regulations
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installation scope25 MWTAR-DD7-01 | Installation scope: 25 MW | 1 MW · Phased by block | on quote |
| Installation scope50 MWTAR-DD7-02 | Installation scope: 50 MW | 1 MW · Phased by block | on quote |
| Installation scope100 MWTAR-DD7-03 | Installation scope: 100 MW | 1 MW · Phased by block | on quote |
| Installation scope200 MWTAR-DD7-04 | Installation scope: 200 MW | 1 MW · Phased by block | on quote |
Specifications
| Installation scope | 25 MW to 200 MW (see variants) |
|---|---|
| Scope | Structure and module installationmade to order: Electrical BoP erection / Complete mechanical and electrical erection |
| Manpower deployed | Peak crew of 200made to order: 25 technicians per MW-block / 60 technicians plus supervisors |
| Supervision | Project manager, engineers, QA/QC |
| Equipment | Pile driver, crane, telehandler |
| Quality plan | ISO 9001 QAP with hold points |
| Safety | Daily toolbox talks, PPE, permitsmade to order: Lost-time-injury-free target, HIRA |
| Licence | Electrical contractor licencemade to order: Class A contractor registration |
| Insurance | CAR and workmen compensationmade to order: CAR, WC and third-party liability |
| Reporting | Weekly report with look-ahead planmade to order: Daily progress report |
| Payment terms | Milestone based with 10% retention |