Catalogue / Cabling, trenching & HDD works
HT cable jointing and termination, Neo seriesSample
by Tarangline Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Tarangline Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Neo service of HT cable jointing and termination by Tarangline covers 4 cable route length options (2 km to 20 km). Highlights: dewatering in high water table, warning tape and marker installation and drum handling and pulling tension control. Suited to railway and highway crossings, industrial plant cabling and urban distribution upgrades. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Tarangline
- Model
- TAR-1C7 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Mobilisation in 7 days
- Warranty
- Workmanship 12 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length2 kmTAR-1C7-01 | Cable route length: 2 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length5 kmTAR-1C7-02 | Cable route length: 5 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length10 kmTAR-1C7-03 | Cable route length: 10 km | 1 km · Permits may extend timeline | on quote |
| Cable route length20 kmTAR-1C7-04 | Cable route length: 20 km | 1 km · Permits may extend timeline | on quote |
Specifications
| Cable route length | 2 km to 20 km (see variants) |
|---|---|
| Method | Trench plus HDD for crossingsmade to order: Open trench / Trenchless HDD |
| HDD capacity | Up to 250 mm boremade to order: Up to 450 mm bore |
| Trench depth | 1.5 m |
| Cable type | LT armouredmade to order: 11/33 kV XLPE |
| Jointing | Cold shrink |
| Restoration | Backfill and compaction onlymade to order: Road and footpath restoration |
| Permissions | Client arranges |
| Testing | Insulation and VLF testmade to order: Hipot and sheath test |
| Productivity | 50 m per day HDD |
| Crew | Trenching team of 15made to order: HDD crew of 8 with rig |