Catalogue / Solar & wind BoP construction
Internal 33 kV cable network, Plus 8 seriesSample
by Tarangline Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Tarangline Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Plus 8 service of internal 33 kV cable network by Tarangline covers 5 project size options (10 MW to 200 MW). Highlights: cable route survey and marking, earth pit resistance records and material reconciliation weekly. Suited to EPC contractors subcontracting BoP, wind-solar hybrid parks and IPPs managing multiple packages. Delivered in line with IS 7098 (XLPE Cables), IEC 62548 and IS 3043 (Earthing). Mobilisation Mobilisation in 14 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Tarangline
- Model
- TAR-A55 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Mobilisation in 14 days
- Warranty
- Defect liability 24 months
- Standards
- IS 7098 (XLPE Cables), IEC 62548, IS 3043 (Earthing)
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Project size10 MWTAR-A55-01 | Project size: 10 MW | 1 MW · Mobilisation in 14 days | on quote |
| Project size25 MWTAR-A55-02 | Project size: 25 MW | 1 MW · Mobilisation in 14 days | on quote |
| Project size50 MWTAR-A55-03 | Project size: 50 MW | 1 MW · Mobilisation in 14 days | on quote |
| Project size100 MWTAR-A55-04 | Project size: 100 MW | 1 MW · 3-9 months execution | on quote |
| Project size200 MWTAR-A55-05 | Project size: 200 MW | 1 MW · 3-9 months execution | on quote |
Specifications
| Project size | 10 MW to 200 MW (see variants) |
|---|---|
| Scope | Cabling and earthingmade to order: Civil plus electrical BoP / Complete BoP except modules |
| DC cables | 4 sq mm solar cable |
| MV cables | 33 kV XLPE Cumade to order: 33 kV XLPE Al armoured |
| Inverter station | Brick built room |
| Lightning protection | Franklin rod with mast |
| Crew size | 300 personsmade to order: 80 persons / 150 persons |
| Equipment | Trenchers, cranes, excavatorsmade to order: Own fleet |
| Quality | QAP with stage inspection |
| Duration | 6-9 months |
| Payment | Milestone based |