Catalogue / Civil & foundation works
Wind turbine foundation construction, Duo seriesSample
by Tarangline Projects (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Tarangline Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Duo service of wind turbine foundation construction by Tarangline covers 5 works volume options (1 MW equivalent to 50 MW equivalent). Design: waterproofing for cable trenches, cube and pile test records and pile layout tolerance maintained to design. Used by solar parks, substations and control rooms and wind farms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation 4-12 weeks execution; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Tarangline
- Model
- TAR-255 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- 4-12 weeks execution
- Warranty
- Structural defect liability 24 months
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume1 MW equivalentTAR-255-01 | Works volume: 1 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume5 MW equivalentTAR-255-02 | Works volume: 5 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume10 MW equivalentTAR-255-03 | Works volume: 10 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume25 MW equivalentTAR-255-04 | Works volume: 25 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume50 MW equivalentTAR-255-05 | Works volume: 50 MW equivalent | 1 job · 4-12 weeks execution | on quote |
Specifications
| Works volume | 1 MW equivalent to 50 MW equivalent (see variants) |
|---|---|
| Foundation type | RCC bored pilemade to order: Driven steel pile / Ramming or screw pile / Raft or isolated footing |
| Concrete grade | M25made to order: M30 / M40 for turbine foundation |
| Pull-out testing | 2% piles tested |
| Reinforcement | Fe 550D |
| Roads and drainage | WBM road with culverts |
| Boundary | Compound wall with barbed wire |
| Quality | NABL lab testing of materialsmade to order: Cube test reports per pour |
| Machinery | Piling rigs and excavators |
| Duration | 4-8 weeksmade to order: 3-6 months |
| Payment terms | Measured running bills |