Catalogue / Civil & foundation works

No photo yet

Wind turbine foundation construction, Duo seriesSample

by Tarangline Projects (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Tarangline Projects (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Duo service of wind turbine foundation construction by Tarangline covers 5 works volume options (1 MW equivalent to 50 MW equivalent). Design: waterproofing for cable trenches, cube and pile test records and pile layout tolerance maintained to design. Used by solar parks, substations and control rooms and wind farms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation 4-12 weeks execution; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Tarangline
Model
TAR-255 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
4-12 weeks execution
Warranty
Structural defect liability 24 months
Standards
IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
Delivers to
South India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Works volume1 MW equivalentTAR-255-01Works volume: 1 MW equivalent1 job · 4-12 weeks executionon quote
Works volume5 MW equivalentTAR-255-02Works volume: 5 MW equivalent1 job · 4-12 weeks executionon quote
Works volume10 MW equivalentTAR-255-03Works volume: 10 MW equivalent1 job · 4-12 weeks executionon quote
Works volume25 MW equivalentTAR-255-04Works volume: 25 MW equivalent1 job · 4-12 weeks executionon quote
Works volume50 MW equivalentTAR-255-05Works volume: 50 MW equivalent1 job · 4-12 weeks executionon quote

Specifications

Works volume1 MW equivalent to 50 MW equivalent (see variants)
Foundation typeRCC bored pilemade to order: Driven steel pile / Ramming or screw pile / Raft or isolated footing
Concrete gradeM25made to order: M30 / M40 for turbine foundation
Pull-out testing2% piles tested
ReinforcementFe 550D
Roads and drainageWBM road with culverts
BoundaryCompound wall with barbed wire
QualityNABL lab testing of materialsmade to order: Cube test reports per pour
MachineryPiling rigs and excavators
Duration4-8 weeksmade to order: 3-6 months
Payment termsMeasured running bills

BARREL: Bharat Atom Renewable Resources Energy Limited