Catalogue / Transformer plinths, oil pits & soak pits
Fire wall between transformers, Prime seriesSample
by Taxila Civil Products (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Taxila Civil Products (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Fire wall between transformers from Taxila, Prime series: 3 transformer rating served options between 5 MVA and 31.5 MVA. Highlights: levelled to alignment of transformer base, rail track for transformer trolley and water-oil separator option. Used by solar and wind pooling stations, captive power plants and generation transformer bays. Delivered in line with IS 456, IS 10028 (Part 2) and CBIP Manual 317. Mobilisation 4-6 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Taxila
- Model
- TAX-A66 series
- Listing type
- Service
- Unit
- nos
- Minimum order
- 1 nos
- Lead time
- 4-6 weeks
- Warranty
- 12 months defect liability
- Standards
- IS 456, IS 10028 (Part 2), CBIP Manual 317
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Transformer rating served5 MVATAX-A66-01 | Transformer rating served: 5 MVA | 1 nos · 4-6 weeks | on quote |
| Transformer rating served10 MVATAX-A66-02 | Transformer rating served: 10 MVA | 1 nos · 4-6 weeks | on quote |
| Transformer rating served31.5 MVATAX-A66-03 | Transformer rating served: 31.5 MVA | 1 nos · 4-6 weeks | on quote |
Specifications
| Transformer rating served | 5 MVA to 31.5 MVA (see variants) |
|---|---|
| Concrete grade | M25made to order: M30 |
| Oil pit capacity | 150% of oil volumemade to order: 110% of oil volume |
| Pit fill | 40 mm stone chips |
| Pit waterproofing | Epoxy coatingmade to order: Integral waterproofing |
| Drain pipe | 300 NBmade to order: 150 NB / 200 NB |
| Fire wall height | 3 m |
| Fire wall thickness | 230 mm brickmade to order: 300 mm RCC |
| Rail track | ISMB 150 rails |
| Reinforcement | Fe 500D |
| Earth pit | 2 nos |