Remote control centre for traction, Plus 6 seriesSample
by Taxila Traction Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Taxila Traction Systems (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Remote control centre for traction from Taxila, Plus 6 series: 3 control posts options between Up to 10 posts and Up to 50 posts. Design: sequence of events recording, integration with OHE maintenance and remote operation of interrupters and isolators. Typically used for industrial rail, metro traction control and mining railways. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 20-28 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Taxila
- Model
- TAX-EA4 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 1 lot
- Lead time
- 20-28 weeks
- Warranty
- 36 months with AMC
- Standards
- RDSO Spec, IEC 60870-5-104, IEC 62443
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Wooden crate, seaworthy
- Delivery terms
- Door delivery in metro cities
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Control postsUp to 10 postsTAX-EA4-01 | Control posts: Up to 10 posts | 1 lot · 20-28 weeks | for verified buyers |
| Control postsUp to 25 postsTAX-EA4-02 | Control posts: Up to 25 posts | 1 lot · 20-28 weeks | for verified buyers |
| Control postsUp to 50 postsTAX-EA4-03 | Control posts: Up to 50 posts | 1 lot · 20-28 weeks | for verified buyers |
Specifications
| Control posts | Up to 10 posts to Up to 50 posts (see variants) |
|---|---|
| Architecture | Redundant server |
| RTU I/O | Per post |
| Communication | GSM backupmade to order: OFC / MPLS |
| Protocol | IEC 61850made to order: IEC 60870-5-104 |
| HMI | Multi-console video wall |
| Historian | 5 years |
| Time sync | GPS |
| Cyber-security | IEC 62443 |
| Redundancy | Hot standby |
| Reports | Energy, faults, SOE |
| Fault location | Impedance based |
| Interlocking | Remote with block |