Catalogue / Traction SCADA

No photo yet

Traction power control software, Elite 4 seriesSample

by Taxila Traction Systems (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Taxila Traction Systems (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Elite 4 range of traction power control software by Taxila covers 5 control posts options (Up to 10 posts to Up to 250 posts). Key features: integration with OHE maintenance, energy and tariff reports and impedance fault locator. Suited to industrial rail, metro traction control and railway zones. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 12-16 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Taxila
Model
TAX-D78 series
Listing type
Product
Unit
lot
Minimum order
1 lot
Lead time
12-16 weeks
Warranty
24 months
Standards
RDSO Spec, IEC 60870-5-104, IEC 62443
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
Corrugated box on pallet
Delivery terms
Ex-works, freight extra at actuals
Returns
Replacement of items damaged in transit within 7 days
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Control postsUp to 10 postsTAX-D78-01Control posts: Up to 10 posts1 lot · 12-16 weeksfor verified buyers
Control postsUp to 25 postsTAX-D78-02Control posts: Up to 25 posts1 lot · 12-16 weeksfor verified buyers
Control postsUp to 50 postsTAX-D78-03Control posts: Up to 50 posts1 lot · 12-16 weeksfor verified buyers
Control postsUp to 100 postsTAX-D78-04Control posts: Up to 100 posts1 lot · 20-28 weeksfor verified buyers
Control postsUp to 250 postsTAX-D78-05Control posts: Up to 250 posts1 lot · 20-28 weeksfor verified buyers

Specifications

Control postsUp to 10 posts to Up to 250 posts (see variants)
ArchitectureRedundant servermade to order: Distributed
RTU I/OPer post
CommunicationGSM backupmade to order: OFC / MPLS
ProtocolIEC 61850made to order: IEC 60870-5-104
HMIMulti-console video wall
Historian5 years
Time syncGPS
Cyber-securityIEC 62443
RedundancyHot standby
ReportsEnergy, faults, SOE
Fault locationImpedance based
InterlockingRemote with block

BARREL: Bharat Atom Renewable Resources Energy Limited