SCADA for 25 kV AC electrification, Max 9 seriesSample
by Taxila Traction Systems (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Request quote from Taxila Traction Systems (Sample)Or send an open RFQ to every matching merchant.
Register your company to see prices.
Taxila Max 9 SCADA for 25 kV AC electrification, offered in 4 control posts options from Up to 25 posts to Up to 250 posts. Design: sequence of events recording, energy and tariff reports and failover in under 3 seconds. Suited to railway zones, metro traction control and mining railways. Designed and tested to RDSO Spec, IEC 60870-5-104 and IEC 62443. Lead time 20-28 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Taxila
- Model
- TAX-C53 series
- Listing type
- Product
- Unit
- lot
- Minimum order
- 1 lot
- Lead time
- 20-28 weeks
- Warranty
- 36 months with AMC
- Standards
- RDSO Spec, IEC 60870-5-104, IEC 62443
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Wooden crate, seaworthy
- Delivery terms
- FOR site, freight included
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Control postsUp to 25 postsTAX-C53-01 | Control posts: Up to 25 posts | 1 lot · 20-28 weeks | for verified buyers |
| Control postsUp to 50 postsTAX-C53-02 | Control posts: Up to 50 posts | 1 lot · 20-28 weeks | for verified buyers |
| Control postsUp to 100 postsTAX-C53-03 | Control posts: Up to 100 posts | 1 lot · 20-28 weeks | for verified buyers |
| Control postsUp to 250 postsTAX-C53-04 | Control posts: Up to 250 posts | 1 lot · 20-28 weeks | for verified buyers |
Specifications
| Control posts | Up to 25 posts to Up to 250 posts (see variants) |
|---|---|
| Architecture | Distributed |
| RTU I/O | Per post |
| Communication | GSM backup |
| Protocol | IEC 61850 |
| HMI | Multi-console video wall |
| Historian | 5 years |
| Time sync | GPS |
| Cyber-security | IEC 62443 |
| Redundancy | Hot standby |
| Reports | Energy, faults, SOE |
| Fault location | Impedance based |
| Interlocking | Remote with block |