Catalogue / Hydro turbines (Francis, Kaplan, Pelton)
Pelton turbine (vertical, multi-jet), Titan 5 seriesSample
by Teestaarc Hydro Engineering (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Teestaarc Hydro Engineering (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Titan 5 range of pelton turbine (vertical, multi-jet) by Teestaarc covers 6 turbine output options (3 MW to 100 MW). Key features: stainless steel runner for sediment-laden rivers, wear-resistant coating for Himalayan silt and model-tested hydraulic design. Suited to reservoir-based plants, renovation and modernisation and run-of-river schemes. Designed and tested to IEC 60193, IEC 60041 and IS 12800. Lead time 10-14 months; delivers to West India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Teestaarc
- Model
- TEE-524 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 10 nos
- Lead time
- 10-14 months
- Warranty
- 24 months from commissioning
- Standards
- IEC 60193, IEC 60041, IS 12800
- Delivers to
- West India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Corrugated box on pallet
- Delivery terms
- FOR nearest railhead
- Returns
- Replacement of items damaged in transit within 7 days
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Turbine output3 MWTEE-524-01 | Turbine output: 3 MW | 10 nos · 10-14 months | on quote |
| Turbine output5 MWTEE-524-02 | Turbine output: 5 MW | 10 nos · 10-14 months | on quote |
| Turbine output10 MWTEE-524-03 | Turbine output: 10 MW | 10 nos · 10-14 months | on quote |
| Turbine output25 MWTEE-524-04 | Turbine output: 25 MW | 10 nos · 10-14 months | on quote |
| Turbine output50 MWTEE-524-05 | Turbine output: 50 MW | 10 nos · 14-20 months | on quote |
| Turbine output100 MWTEE-524-06 | Turbine output: 100 MW | 10 nos · 14-20 months | on quote |
Specifications
| Turbine output | 3 MW to 100 MW (see variants) |
|---|---|
| Turbine type | Peltonmade to order: Francis / Kaplan / Bulb |
| Net head | 30-200 mmade to order: 5-30 m / 200-800 m |
| Rated speed | 375 rpmmade to order: 428 rpm / 500 rpm / 750 rpm |
| Shaft orientation | Horizontal |
| Runner material | Cast carbon steelmade to order: 13Cr-4Ni stainless steel |
| Efficiency at best point | 94%made to order: 91% / 93% |
| Flow range | 3-100 m3/s |
| Wicket gates | Cast steel with oil-free bushes |
| Runaway speed | 2.2 x ratedmade to order: 1.8 x rated |
| Design life | 40 years |