Catalogue / Battery recycling & second life
Second-life battery assessment and repurposing, Prime seriesSample
by Teesta Capital Advisors (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Teesta Capital Advisors (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Second-life battery assessment and repurposing from Teesta, Prime series: 6 quantity options between 0.5 tonne and 100 tonnes. Design: safe discharge and packing, EPR certificate for compliance and soH assessment for reuse. Used by telecom and UPS users, battery makers and EV and e-mobility fleets. Delivered in line with Battery Waste Management Rules 2022, Hazardous Waste Rules 2016 and CPCB Guidelines. Mobilisation Pick-up in 7-14 days; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Teesta
- Model
- TEE-C46 series
- Listing type
- Service
- Unit
- tonne
- Minimum order
- 1 tonne
- Lead time
- Pick-up in 7-14 days
- Warranty
- Certificate of recycling
- Standards
- Battery Waste Management Rules 2022, Hazardous Waste Rules 2016, CPCB Guidelines
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Quantity0.5 tonneTEE-C46-01 | Quantity: 0.5 tonne | 1 tonne · Pick-up in 7-14 days | on quote |
| Quantity1 tonneTEE-C46-02 | Quantity: 1 tonne | 1 tonne · Pick-up in 7-14 days | on quote |
| Quantity5 tonnesTEE-C46-03 | Quantity: 5 tonnes | 1 tonne · Pick-up in 7-14 days | on quote |
| Quantity10 tonnesTEE-C46-04 | Quantity: 10 tonnes | 1 tonne · Pick-up in 7-14 days | on quote |
| Quantity50 tonnesTEE-C46-05 | Quantity: 50 tonnes | 1 tonne · Processing 2-8 weeks | on quote |
| Quantity100 tonnesTEE-C46-06 | Quantity: 100 tonnes | 1 tonne · Processing 2-8 weeks | on quote |
Specifications
| Quantity | 0.5 tonne to 100 tonnes (see variants) |
|---|---|
| Chemistry | Lead-acid |
| Process | Hydrometallurgy |
| Second life | Repurposed pack for stationary storagemade to order: SoH test and grading |
| Recovery rate | Above 90% |
| Authorisation | CPCB authorised |
| Collection | Pick-up with safe packagingmade to order: Client delivers |
| Certificate | EPR certificate |
| Safety | Fire-safe storagemade to order: Transport per hazardous norms |
| Turnaround | 1-2 monthsmade to order: 2-4 weeks |
| Pricing basis | Value share |