Heat recovery steam generator (HRSG), Neo seriesSample
by Teestakiran Power Plant Equipment (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Teestakiran Power Plant Equipment (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Teestakiran Neo heat recovery steam generator (HRSG), offered in 3 steam capacity options from 300 TPH to 1100 TPH. Design: IBR-approved design and pressure parts, low NOx combustion system and meets CPCB norms with ESP or FGD. Typically used for cogeneration, utility thermal power stations and captive power plants. Designed and tested to IBR 1950, IS 2825 and ASME Sec I. Lead time 10-14 months; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Teestakiran
- Model
- TEE-BB7 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 2 nos
- Lead time
- 10-14 months
- Warranty
- 18 months from commissioning
- Standards
- IBR 1950, IS 2825, ASME Sec I
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Steam capacity300 TPHTEE-BB7-01 | Steam capacity: 300 TPH | 2 nos · 10-14 months | for verified buyers |
| Steam capacity670 TPHTEE-BB7-02 | Steam capacity: 670 TPH | 2 nos · 10-14 months | for verified buyers |
| Steam capacity1100 TPHTEE-BB7-03 | Steam capacity: 1100 TPH | 2 nos · 10-14 months | for verified buyers |
Specifications
| Steam capacity | 300 TPH to 1100 TPH (see variants) |
|---|---|
| Boiler type | HRSGmade to order: PC / CFBC / Water-tube |
| Steam pressure | 110 bar |
| Steam temperature | 540 Cmade to order: 485 C / 565 C |
| Fuel | Biomass |
| Circulation | Naturalmade to order: Assisted |
| Design code | IBR |
| Efficiency | 87%made to order: 84% / 89% |
| Air preheater | Regenerative |
| Emission control | Bag filter |
| Control | DCS |