Catalogue / Boilers & HRSG

No photo yet

Heat recovery steam generator (HRSG), Neo seriesSample

by Teestakiran Power Plant Equipment (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Teestakiran Power Plant Equipment (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Teestakiran Neo heat recovery steam generator (HRSG), offered in 3 steam capacity options from 300 TPH to 1100 TPH. Design: IBR-approved design and pressure parts, low NOx combustion system and meets CPCB norms with ESP or FGD. Typically used for cogeneration, utility thermal power stations and captive power plants. Designed and tested to IBR 1950, IS 2825 and ASME Sec I. Lead time 10-14 months; delivers to North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Teestakiran
Model
TEE-BB7 series
Listing type
Product
Unit
nos
Minimum order
2 nos
Lead time
10-14 months
Warranty
18 months from commissioning
Standards
IBR 1950, IS 2825, ASME Sec I
Delivers to
North India
GST rate
18 %
Country of origin
India
Packaging
Steel skid with shrink wrap
Delivery terms
Ex-works, freight extra at actuals
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Steam capacity300 TPHTEE-BB7-01Steam capacity: 300 TPH2 nos · 10-14 monthsfor verified buyers
Steam capacity670 TPHTEE-BB7-02Steam capacity: 670 TPH2 nos · 10-14 monthsfor verified buyers
Steam capacity1100 TPHTEE-BB7-03Steam capacity: 1100 TPH2 nos · 10-14 monthsfor verified buyers

Specifications

Steam capacity300 TPH to 1100 TPH (see variants)
Boiler typeHRSGmade to order: PC / CFBC / Water-tube
Steam pressure110 bar
Steam temperature540 Cmade to order: 485 C / 565 C
FuelBiomass
CirculationNaturalmade to order: Assisted
Design codeIBR
Efficiency87%made to order: 84% / 89%
Air preheaterRegenerative
Emission controlBag filter
ControlDCS

BARREL: Bharat Atom Renewable Resources Energy Limited