Catalogue / Tower erection gin poles & derricks
Pulley block and gin pole set, Titan seriesSample
by Teesta Tools & Tackles (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Teesta Tools & Tackles (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Pulley block and gin pole set from Teesta, Titan series: 5 safe working load options between 500 kg and 5 t. Key features: designed for tower sections up to rated load, erection manual supplied and galvanised for outdoor use. Typically used for transmission tower erection, distribution pole work and telecom and monopole tower works. Designed and tested to IS 802, IS 2266 and IS 807. Lead time 3-4 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Teesta
- Model
- TEE-C74 series
- Listing type
- Product
- Unit
- set
- Minimum order
- 2 set
- Lead time
- 3-4 weeks
- Warranty
- 12 months from supply
- Standards
- IS 802, IS 2266, IS 807
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- Ex-works, freight extra at actuals
- Returns
- Returns within 15 days if unused, in original packing
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Safe working load500 kgTEE-C74-01 | Safe working load: 500 kg | 2 set · 3-4 weeks | for verified buyers |
| Safe working load1 tTEE-C74-02 | Safe working load: 1 t | 2 set · 3-4 weeks | for verified buyers |
| Safe working load2 tTEE-C74-03 | Safe working load: 2 t | 2 set · 3-4 weeks | for verified buyers |
| Safe working load3 tTEE-C74-04 | Safe working load: 3 t | 2 set · 6-8 weeks | for verified buyers |
| Safe working load5 tTEE-C74-05 | Safe working load: 5 t | 2 set · 6-8 weeks | for verified buyers |
Specifications
| Safe working load | 500 kg to 5 t (see variants) |
|---|---|
| Pole type | Lattice |
| Pole length | 9 mmade to order: 12 m / 18 m / 24 m |
| Material | MS galvanisedmade to order: Aluminium alloy |
| Winch | Hand |
| Guy ropes | 6 nosmade to order: 4 nos |
| Wire rope diameter | 16 mmmade to order: 10 mm / 12 mm |
| Tower height | Up to 42 m |
| Weight | 250 kg |
| Safety factor | 5:1 |
| Pulley blocks | Included |