Catalogue / Battery recycling & second life
Black mass recovery, Titan seriesSample
by Tejline Corporate Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Tejline Corporate Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Titan service of black mass recovery by Tejline covers 3 quantity options (5 tonnes to 50 tonnes). Key features: EPR certificate for compliance, authorised recycling and black mass supply option. Typically used for telecom and UPS users, battery makers and BESS operators. Delivered in line with Battery Waste Management Rules 2022, Hazardous Waste Rules 2016 and CPCB Guidelines. Mobilisation Processing 2-8 weeks; serves South India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Tejline
- Model
- TEJ-E42 series
- Listing type
- Service
- Unit
- tonne
- Minimum order
- 1 tonne
- Lead time
- Processing 2-8 weeks
- Warranty
- Certificate of recycling
- Standards
- Battery Waste Management Rules 2022, Hazardous Waste Rules 2016, CPCB Guidelines
- Delivers to
- South India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Quantity5 tonnesTEJ-E42-01 | Quantity: 5 tonnes | 1 tonne · Processing 2-8 weeks | on quote |
| Quantity10 tonnesTEJ-E42-02 | Quantity: 10 tonnes | 1 tonne · Processing 2-8 weeks | on quote |
| Quantity50 tonnesTEJ-E42-03 | Quantity: 50 tonnes | 1 tonne · Processing 2-8 weeks | on quote |
Specifications
| Quantity | 5 tonnes to 50 tonnes (see variants) |
|---|---|
| Chemistry | Lead-acidmade to order: Li-ion NMC / LFP |
| Process | Hydrometallurgy |
| Second life | SoH test and gradingmade to order: Repurposed pack for stationary storage |
| Recovery rate | 95% for metalsmade to order: Above 90% |
| Authorisation | Registered recycler |
| Collection | Pick-up with safe packaging |
| Certificate | EPR certificatemade to order: Recycling certificate |
| Safety | Fire-safe storage |
| Turnaround | 1-2 monthsmade to order: 2-4 weeks |
| Pricing basis | Value share |