Catalogue / Energy audits

No photo yet

Electrical load and power quality audit, Eco seriesSample

by Tejtek Advisory (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Tejtek Advisory (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Tejtek Eco electrical load and power quality audit, offered in 4 connected load options from 5 MW to 50 MW. Key features: savings quantified with measured data, verification after implementation and power factor and harmonics assessment. Suited to hospitals and hotels, commercial buildings and industrial plants. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Report in 2-4 weeks; serves All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Tejtek
Model
TEJ-9B9 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Report in 2-4 weeks
Warranty
Clarifications for 6 months
Standards
Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
Delivers to
All India
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Connected load5 MWTEJ-9B9-01Connected load: 5 MW1 site · Report in 2-4 weeksfor verified buyers
Connected load10 MWTEJ-9B9-02Connected load: 10 MW1 site · Report in 2-4 weeksfor verified buyers
Connected load25 MWTEJ-9B9-03Connected load: 25 MW1 site · Report in 2-4 weeksfor verified buyers
Connected load50 MWTEJ-9B9-04Connected load: 50 MW1 site · Report in 2-4 weeksfor verified buyers

Specifications

Connected load5 MW to 50 MW (see variants)
Audit levelDetailed audit
InstrumentsPower analyser, thermal cameramade to order: Ultrasonic flow meter, lux meter
AuditorCertified Energy Managermade to order: BEE accredited energy auditor
ReportSavings opportunities with payback
BaselineMeasured baseline
Measurement duration3 days
CoverageElectrical
StatutoryPAT scheme Form-A
DeliverableReport and presentationmade to order: Report and monitoring plan
Follow-upNot includedmade to order: Verification after implementation

BARREL: Bharat Atom Renewable Resources Energy Limited