Catalogue / Substation automation (IEC 61850)

No photo yet

Digital substation process bus, Plus seriesSample

by Tejtron Relays & Controls (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Tejtron Relays & Controls (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Plus range of digital substation process bus by Tejtron covers 3 bays options (Up to 16 bays to Up to 64 bays). Highlights: redundant network with zero-recovery time, cyber-secure remote access and fully tested using IEC 61850 configurator. Suited to industrial plants, solar pooling stations and transmission substations. Designed and tested to IEC 61850, IEC 62351 and IEC 60870-5-104. Lead time 10-14 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Tejtron
Model
TEJ-982 series
Listing type
Product
Unit
lot
Minimum order
2 lot
Lead time
10-14 weeks
Warranty
24 months
Standards
IEC 61850, IEC 62351, IEC 60870-5-104
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
Corrugated box on pallet
Delivery terms
FOR nearest railhead
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
BaysUp to 16 baysTEJ-982-01Bays: Up to 16 bays2 lot · 10-14 weeksfor verified buyers
BaysUp to 32 baysTEJ-982-02Bays: Up to 32 bays2 lot · 10-14 weeksfor verified buyers
BaysUp to 64 baysTEJ-982-03Bays: Up to 64 bays2 lot · 10-14 weeksfor verified buyers

Specifications

BaysUp to 16 bays to Up to 64 bays (see variants)
ArchitectureStation busmade to order: Station + process bus
ProtocolIEC 60870-5-104made to order: IEC 61850 Ed 2 / DNP3
Network topologyDual star
HMIRedundant servers
Time syncSNTP
GatewayRedundant to RLDC / SLDC
Cyber-securityFirewall, IEC 62351, NERC style
HistorianIncluded, 5 years data
Engineering toolConfiguration software
Network switchesIndustrial managed
Auxiliary supply110 V DC
TestingFAT + SAT

BARREL: Bharat Atom Renewable Resources Energy Limited