Catalogue / Mobile substations

No photo yet

Containerised mobile substation, Titan seriesSample

by Thanjavurprakash Transformer Works (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Thanjavurprakash Transformer Works (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

Thanjavurprakash Titan containerised mobile substation, offered in 4 transformer rating options from 10 MVA to 50 MVA. Key features: suitable for road transport within weight limits, pre-wired and tested on a trailer and all protection in a control cabin. Typically used for discom emergency backup, event power supply and mining sites. Designed and tested to IEC 62271-202, IS 2026 and IEC 60076. Lead time 30-40 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Thanjavurprakash
Model
THA-8E4 series
Listing type
Product
Unit
nos
Minimum order
1 nos
Lead time
30-40 weeks
Warranty
36 months
Standards
IEC 62271-202, IS 2026, IEC 60076
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
Steel skid with shrink wrap
Delivery terms
FOR nearest railhead
Returns
Returns within 15 days if unused, in original packing
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Transformer rating10 MVATHA-8E4-01Transformer rating: 10 MVA1 nos · 30-40 weeksfor verified buyers
Transformer rating20 MVATHA-8E4-02Transformer rating: 20 MVA1 nos · 30-40 weeksfor verified buyers
Transformer rating31.5 MVATHA-8E4-03Transformer rating: 31.5 MVA1 nos · 30-40 weeksfor verified buyers
Transformer rating50 MVATHA-8E4-04Transformer rating: 50 MVA1 nos · 30-40 weeksfor verified buyers

Specifications

Transformer rating10 MVA to 50 MVA (see variants)
Primary voltage132 kV
Secondary voltage33 kVmade to order: 11 kV
ChassisSkidmade to order: Low-bed trailer / Container
Primary switchgearGIS bay
Secondary switchgearIndoor VCB panel
Control and relayNumerical relays
Fire protectionDetection and extinguisher
Auxiliary supplyDC battery + DG
Transport weightUp to 45 t
Setup time< 4 hoursmade to order: < 24 hours
GroundingMobile earthing kit
Cable reelIncluded

BARREL: Bharat Atom Renewable Resources Energy Limited