Catalogue / Furnace & rectifier transformers

No photo yet

Rectifier transformer for electrolysis, Volt seriesSample

by Thanjavurprakash Transformer Works (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Thanjavurprakash Transformer Works (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Volt range of rectifier transformer for electrolysis by Thanjavurprakash covers 4 rating options (10 MVA to 60 MVA). Highlights: high current LV bus design, heavy-duty OLTC for many operations per day and withstands frequent short-circuit duty. Suited to chlor-alkali, aluminium smelters and steel melting shops. Designed and tested to IS 2026, IEC 60076 and IEC 61378-1. Lead time 28-36 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Thanjavurprakash
Model
THA-BF8 series
Listing type
Product
Unit
nos
Minimum order
5 nos
Lead time
28-36 weeks
Warranty
36 months from supply
Standards
IS 2026, IEC 60076, IEC 61378-1
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
As per item, transit-safe
Delivery terms
FOR site, freight included
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Rating10 MVATHA-BF8-01Rating: 10 MVA5 nos · 28-36 weeksfor verified buyers
Rating20 MVATHA-BF8-02Rating: 20 MVA5 nos · 28-36 weeksfor verified buyers
Rating40 MVATHA-BF8-03Rating: 40 MVA5 nos · 28-36 weeksfor verified buyers
Rating60 MVATHA-BF8-04Rating: 60 MVA5 nos · 28-36 weeksfor verified buyers

Specifications

Rating10 MVA to 60 MVA (see variants)
Primary voltage132 kVmade to order: 11 kV / 33 kV / 66 kV
Secondary voltageUp to 1000 V
ApplicationSAFmade to order: EAF / LRF / Rectifier
CoolingOFAFmade to order: ONAN/ONAF / OFWF
Tap changerOLTC
Secondary tapsUp to 21 steps
Vector groupDd0
Overload20% for 2 hours
Impedance6%
ReactorExternal
BushingsHigh-current plate type
MonitoringOnline DGA optional

BARREL: Bharat Atom Renewable Resources Energy Limited