Catalogue / Shunt & series reactors

No photo yet

Oil-immersed shunt reactor, Pro seriesSample

by Thanjavurprakash Transformer Works (Sample) · verified by BARREL

Price for verified buyers

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Thanjavurprakash Transformer Works (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Register your company to see prices.

The Pro range of oil-immersed shunt reactor by Thanjavurprakash covers 6 rating options (5 MVAr to 125 MVAr). Design: protection and monitoring devices, switching surge tested and linear magnetisation. Used by EHV line compensation, reactive power management and fault current limiting. Designed and tested to IEC 60076-6, IS 5553 and CBIP Manual. Lead time 20-28 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Thanjavurprakash
Model
THA-754 series
Listing type
Product
Unit
nos
Minimum order
1 nos
Lead time
20-28 weeks
Warranty
24 months from commissioning
Standards
IEC 60076-6, IS 5553, CBIP Manual
Delivers to
All India
GST rate
18 %
Country of origin
India
Packaging
Drum / reel with end caps
Delivery terms
FOR nearest railhead
Returns
No returns on made-to-order items
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Rating5 MVArTHA-754-01Rating: 5 MVAr1 nos · 20-28 weeksfor verified buyers
Rating10 MVArTHA-754-02Rating: 10 MVAr1 nos · 20-28 weeksfor verified buyers
Rating25 MVArTHA-754-03Rating: 25 MVAr1 nos · 20-28 weeksfor verified buyers
Rating50 MVArTHA-754-04Rating: 50 MVAr1 nos · 20-28 weeksfor verified buyers
Rating80 MVArTHA-754-05Rating: 80 MVAr1 nos · 40-50 weeksfor verified buyers
Rating125 MVArTHA-754-06Rating: 125 MVAr1 nos · 40-50 weeksfor verified buyers

Specifications

Rating5 MVAr to 125 MVAr (see variants)
System voltage220 kV
TypeShuntmade to order: Series / Neutral
ConstructionOil-immersed gapped coremade to order: Air-core dry
PhasesThree
CoolingONANmade to order: ONAF
Impedance linearityLinear up to 1.5 pu
Loss< 0.2% of rating
Noise level< 80 dB(A)
TapTappedmade to order: Fixed
BushingsOil-to-air condenser
InsulationMineral oil
MonitoringBuchholz, OTI, PRD

BARREL: Bharat Atom Renewable Resources Energy Limited