Catalogue / Grid connectivity & GNA applications
GNA application with CTUIL, Elite 2 seriesSample
by Thanjavur Projects (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Thanjavur Projects (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
GNA application with CTUIL from Thanjavur, Elite 2 series: 6 capacity applied options between 10 MW and 1000 MW. Highlights: bank guarantee timeline tracking, handling of CTU queries and preparation of mandatory technical details. Suited to industrial captive generators, renewable developers and storage developers. Delivered in line with CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations and Indian Electricity Grid Code. Mobilisation Grant 3-9 months; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Thanjavur
- Model
- THA-B81 series
- Listing type
- Service
- Unit
- application
- Minimum order
- 1 application
- Lead time
- Grant 3-9 months
- Warranty
- As per contract
- Standards
- CERC (Connectivity and General Network Access) Regulations 2022, CEA (Technical Standards for Connectivity) Regulations, Indian Electricity Grid Code
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Capacity applied10 MWTHA-B81-01 | Capacity applied: 10 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied50 MWTHA-B81-02 | Capacity applied: 50 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied100 MWTHA-B81-03 | Capacity applied: 100 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied250 MWTHA-B81-04 | Capacity applied: 250 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied500 MWTHA-B81-05 | Capacity applied: 500 MW | 1 application · Grant 3-9 months | for verified buyers |
| Capacity applied1000 MWTHA-B81-06 | Capacity applied: 1000 MW | 1 application · Grant 3-9 months | for verified buyers |
Specifications
| Capacity applied | 10 MW to 1000 MW (see variants) |
|---|---|
| Application | GNA |
| Scope | Document preparation and filing |
| Bank guarantee | Arranged through partner bankmade to order: Arranged by client |
| Studies | Detailed power system studymade to order: Grid impact summary |
| Portal handling | STU portalmade to order: CTUIL portal |
| Team | Dedicated managermade to order: Regulatory lead and engineer |
| Timeline | Filing in 2 weeksmade to order: Approval 3-6 months |
| Technical documents | Switchyard layout and GA drawings |
| Queries | Until grantmade to order: Responded within 2 days |
| Fee basis | Fixedmade to order: Fixed plus success |