Catalogue / Cabling, trenching & HDD works
HT cable jointing and termination, Titan seriesSample
by Tirhut Infra Services (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Tirhut Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Titan service of HT cable jointing and termination by Tirhut covers 3 cable route length options (2 km to 10 km). Design: utility locating before excavation, drum handling and pulling tension control and traffic management at crossings. Suited to industrial plant cabling, urban distribution upgrades and railway and highway crossings. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Tirhut
- Model
- TIR-1C1 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Mobilisation in 7 days
- Warranty
- Restoration warranty 6 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length2 kmTIR-1C1-01 | Cable route length: 2 km | 1 km · Mobilisation in 7 days | for verified buyers |
| Cable route length5 kmTIR-1C1-02 | Cable route length: 5 km | 1 km · Mobilisation in 7 days | for verified buyers |
| Cable route length10 kmTIR-1C1-03 | Cable route length: 10 km | 1 km · Mobilisation in 7 days | for verified buyers |
Specifications
| Cable route length | 2 km to 10 km (see variants) |
|---|---|
| Method | Trenchless HDD |
| HDD capacity | Up to 450 mm bore |
| Trench depth | 1.2 mmade to order: 0.9 m / 1.5 m |
| Cable type | LT armouredmade to order: 11/33 kV XLPE |
| Jointing | Premouldedmade to order: Heat shrink / Cold shrink |
| Restoration | Backfill and compaction onlymade to order: Road and footpath restoration |
| Permissions | Contractor arranges road cut approvalsmade to order: Client arranges |
| Testing | Insulation and VLF testmade to order: Hipot and sheath test |
| Productivity | 300 m per day open trenchmade to order: 50 m per day HDD |
| Crew | HDD crew of 8 with rigmade to order: Trenching team of 15 |