Catalogue / Civil & foundation works

No photo yet

Wind turbine foundation construction, Edge 6 seriesSample

by Tirhut Infra Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Tirhut Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Wind turbine foundation construction from Tirhut, Edge 6 series: 5 works volume options between 1 MW equivalent and 50 MW equivalent. Design: monsoon-ready drainage planning, pile layout tolerance maintained to design and daily quantity and progress log. Used by solar parks, wind farms and substations and control rooms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation 4-12 weeks execution; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Tirhut
Model
TIR-255 series
Listing type
Service
Unit
job
Minimum order
1 job
Lead time
4-12 weeks execution
Warranty
Structural defect liability 24 months
Standards
IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Works volume1 MW equivalentTIR-255-01Works volume: 1 MW equivalent1 job · 4-12 weeks executionon quote
Works volume5 MW equivalentTIR-255-02Works volume: 5 MW equivalent1 job · 4-12 weeks executionon quote
Works volume10 MW equivalentTIR-255-03Works volume: 10 MW equivalent1 job · 4-12 weeks executionon quote
Works volume25 MW equivalentTIR-255-04Works volume: 25 MW equivalent1 job · 4-12 weeks executionon quote
Works volume50 MW equivalentTIR-255-05Works volume: 50 MW equivalent1 job · 4-12 weeks executionon quote

Specifications

Works volume1 MW equivalent to 50 MW equivalent (see variants)
Foundation typeRCC bored pile
Concrete gradeM25
Pull-out testingRandom test plus lateral loadmade to order: 2% piles tested
ReinforcementFe 500D TMT
Roads and drainageMurram road, 4 m widemade to order: WBM road with culverts / Not included
BoundaryChain link fence 2.4 m
QualityCube test reports per pour
MachineryBatching plant at site
Duration4-8 weeksmade to order: 3-6 months
Payment termsItem rate with retention

BARREL: Bharat Atom Renewable Resources Energy Limited