Catalogue / Civil & foundation works
Wind turbine foundation construction, Edge 6 seriesSample
by Tirhut Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Tirhut Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Wind turbine foundation construction from Tirhut, Edge 6 series: 5 works volume options between 1 MW equivalent and 50 MW equivalent. Design: monsoon-ready drainage planning, pile layout tolerance maintained to design and daily quantity and progress log. Used by solar parks, wind farms and substations and control rooms. Delivered in line with IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations) and IS 1893 (Seismic Design). Mobilisation 4-12 weeks execution; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Tirhut
- Model
- TIR-255 series
- Listing type
- Service
- Unit
- job
- Minimum order
- 1 job
- Lead time
- 4-12 weeks execution
- Warranty
- Structural defect liability 24 months
- Standards
- IS 456 (Plain and Reinforced Concrete), IS 2911 (Pile Foundations), IS 1893 (Seismic Design)
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Works volume1 MW equivalentTIR-255-01 | Works volume: 1 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume5 MW equivalentTIR-255-02 | Works volume: 5 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume10 MW equivalentTIR-255-03 | Works volume: 10 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume25 MW equivalentTIR-255-04 | Works volume: 25 MW equivalent | 1 job · 4-12 weeks execution | on quote |
| Works volume50 MW equivalentTIR-255-05 | Works volume: 50 MW equivalent | 1 job · 4-12 weeks execution | on quote |
Specifications
| Works volume | 1 MW equivalent to 50 MW equivalent (see variants) |
|---|---|
| Foundation type | RCC bored pile |
| Concrete grade | M25 |
| Pull-out testing | Random test plus lateral loadmade to order: 2% piles tested |
| Reinforcement | Fe 500D TMT |
| Roads and drainage | Murram road, 4 m widemade to order: WBM road with culverts / Not included |
| Boundary | Chain link fence 2.4 m |
| Quality | Cube test reports per pour |
| Machinery | Batching plant at site |
| Duration | 4-8 weeksmade to order: 3-6 months |
| Payment terms | Item rate with retention |