Catalogue / Cabling, trenching & HDD works
Duct bank and conduit installation, Volt 8 seriesSample
by Tirhut Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Tirhut Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Volt 8 service of duct bank and conduit installation by Tirhut covers 3 cable route length options (10 km to 50 km). Design: warning tape and marker installation, HDD bore log and as-built survey and utility locating before excavation. Typically used for industrial plant cabling, urban distribution upgrades and railway and highway crossings. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Tirhut
- Model
- TIR-C13 series
- Listing type
- Service
- Unit
- km
- Minimum order
- 1 km
- Lead time
- Mobilisation in 7 days
- Warranty
- Workmanship 12 months
- Standards
- IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Cable route length10 kmTIR-C13-01 | Cable route length: 10 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length20 kmTIR-C13-02 | Cable route length: 20 km | 1 km · Mobilisation in 7 days | on quote |
| Cable route length50 kmTIR-C13-03 | Cable route length: 50 km | 1 km · Mobilisation in 7 days | on quote |
Specifications
| Cable route length | 10 km to 50 km (see variants) |
|---|---|
| Method | Trench plus HDD for crossingsmade to order: Open trench / Trenchless HDD |
| HDD capacity | Up to 250 mm boremade to order: Up to 450 mm bore |
| Trench depth | 1.2 mmade to order: 0.9 m / 1.5 m |
| Cable type | LT armouredmade to order: 11/33 kV XLPE |
| Jointing | Premouldedmade to order: Heat shrink / Cold shrink |
| Restoration | Backfill and compaction onlymade to order: Road and footpath restoration |
| Permissions | Contractor arranges road cut approvalsmade to order: Client arranges |
| Testing | Insulation and VLF test |
| Productivity | 300 m per day open trenchmade to order: 50 m per day HDD |
| Crew | HDD crew of 8 with rig |