Catalogue / Cabling, trenching & HDD works

No photo yet

Duct bank and conduit installation, Volt 8 seriesSample

by Tirhut Infra Services (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Tirhut Infra Services (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

The Volt 8 service of duct bank and conduit installation by Tirhut covers 3 cable route length options (10 km to 50 km). Design: warning tape and marker installation, HDD bore log and as-built survey and utility locating before excavation. Typically used for industrial plant cabling, urban distribution upgrades and railway and highway crossings. Delivered in line with IS 1255 (Cable Installation), IS 7098 (XLPE Cables) and IEC 60840. Mobilisation Mobilisation in 7 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Tirhut
Model
TIR-C13 series
Listing type
Service
Unit
km
Minimum order
1 km
Lead time
Mobilisation in 7 days
Warranty
Workmanship 12 months
Standards
IS 1255 (Cable Installation), IS 7098 (XLPE Cables), IEC 60840
Delivers to
All India and export (SAARC, Middle East, Africa)
GST rate
18 %
Country of origin
India
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Cable route length10 kmTIR-C13-01Cable route length: 10 km1 km · Mobilisation in 7 dayson quote
Cable route length20 kmTIR-C13-02Cable route length: 20 km1 km · Mobilisation in 7 dayson quote
Cable route length50 kmTIR-C13-03Cable route length: 50 km1 km · Mobilisation in 7 dayson quote

Specifications

Cable route length10 km to 50 km (see variants)
MethodTrench plus HDD for crossingsmade to order: Open trench / Trenchless HDD
HDD capacityUp to 250 mm boremade to order: Up to 450 mm bore
Trench depth1.2 mmade to order: 0.9 m / 1.5 m
Cable typeLT armouredmade to order: 11/33 kV XLPE
JointingPremouldedmade to order: Heat shrink / Cold shrink
RestorationBackfill and compaction onlymade to order: Road and footpath restoration
PermissionsContractor arranges road cut approvalsmade to order: Client arranges
TestingInsulation and VLF test
Productivity300 m per day open trenchmade to order: 50 m per day HDD
CrewHDD crew of 8 with rig

BARREL: Bharat Atom Renewable Resources Energy Limited