Catalogue / Installation & erection
Turbine tower and nacelle erection support, Edge 7 seriesSample
by Tirhut Infra Services (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Tirhut Infra Services (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
The Edge 7 service of turbine tower and nacelle erection support by Tirhut covers 4 installation scope options (5 MW to 50 MW). Key features: material reconciliation reports, mobile team available for remote sites and torque-verified structure and module fixing. Typically used for wind farm substations, utility solar parks and c&I rooftop and ground mount. Delivered in line with IS 732 (Electrical Wiring), IEC 62548 and CEA (Measures relating to Safety) Regulations. Mobilisation Mobilisation in 10 days; serves All India and export (SAARC, Middle East, Africa). Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Tirhut
- Model
- TIR-C48 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Mobilisation in 10 days
- Warranty
- Defect liability 24 months
- Standards
- IS 732 (Electrical Wiring), IEC 62548, CEA (Measures relating to Safety) Regulations
- Delivers to
- All India and export (SAARC, Middle East, Africa)
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Installation scope5 MWTIR-C48-01 | Installation scope: 5 MW | 1 MW · Mobilisation in 10 days | on quote |
| Installation scope10 MWTIR-C48-02 | Installation scope: 10 MW | 1 MW · Mobilisation in 10 days | on quote |
| Installation scope25 MWTIR-C48-03 | Installation scope: 25 MW | 1 MW · Phased by block | on quote |
| Installation scope50 MWTIR-C48-04 | Installation scope: 50 MW | 1 MW · Phased by block | on quote |
Specifications
| Installation scope | 5 MW to 50 MW (see variants) |
|---|---|
| Scope | Electrical BoP erection |
| Manpower deployed | 60 technicians plus supervisorsmade to order: 25 technicians per MW-block / Peak crew of 200 |
| Supervision | Site engineer and safety officer |
| Equipment | Own cranes and erection toolsmade to order: Pile driver, crane, telehandler |
| Quality plan | ISO 9001 QAP with hold pointsmade to order: Client-approved ITP |
| Safety | Lost-time-injury-free target, HIRAmade to order: Daily toolbox talks, PPE, permits |
| Licence | Electrical contractor licence |
| Insurance | CAR, WC and third-party liabilitymade to order: CAR and workmen compensation |
| Reporting | Weekly report with look-ahead plan |
| Payment terms | Milestone based with 10% retentionmade to order: Monthly running bills |