Programmable logic controller (PLC) modular, Neo 5 seriesSample
by Trishultron Controls (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Trishultron Controls (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Trishultron Neo 5 programmable logic controller (PLC) modular, offered in 3 i/O points options from 128 I/O to 512 I/O. Key features: hot standby redundancy with bumpless transfer, onboard diagnostics and web server and integrated safety (SIL 2/3) option. Typically used for power plant balance-of-plant control, boiler and turbine auxiliaries and substation and process automation. Designed and tested to IEC 61131-2, IEC 61131-3 and IEC 61508 (SIL 2/3). Lead time 8-12 weeks; delivers to All India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Trishultron
- Model
- TRI-7E8 series
- Listing type
- Product
- Unit
- nos
- Minimum order
- 5 nos
- Lead time
- 8-12 weeks
- Warranty
- 12 months from commissioning
- Standards
- IEC 61131-2, IEC 61131-3, IEC 61508 (SIL 2/3)
- Delivers to
- All India
- GST rate
- 18 %
- Country of origin
- India
- Packaging
- Steel skid with shrink wrap
- Delivery terms
- FOR site, freight included
- Returns
- No returns on made-to-order items
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| I/O points128 I/OTRI-7E8-01 | I/O points: 128 I/O | 5 nos · 8-12 weeks | for verified buyers |
| I/O points256 I/OTRI-7E8-02 | I/O points: 256 I/O | 5 nos · 8-12 weeks | for verified buyers |
| I/O points512 I/OTRI-7E8-03 | I/O points: 512 I/O | 5 nos · 8-12 weeks | for verified buyers |
Specifications
| I/O points | 128 I/O to 512 I/O (see variants) |
|---|---|
| CPU memory | 512 KB |
| Scan time | < 0.1 ms per 1kmade to order: < 1 ms per 1k instructions |
| Redundancy | Hot standby CPU and network |
| Programming | IEC 61131-3 (LD, FBD, ST) |
| Communication | Profibus DP |
| Digital input | 24 VDC sink/source |
| Analog input | 4-20 mA HARTmade to order: RTD/TC |
| Power supply | 110-230 VAC |
| Operating temperature | 0 to 60 °Cmade to order: -25 to 70 °C |
| Hot swap | Yes, I/O modules |
| Security | Password + access control, firmware signing |