Peak load management and curtailment, Eco 6 seriesSample
by Tungabhadraneel Associates (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Tungabhadraneel Associates (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
Peak load management and curtailment from Tungabhadraneel, Eco 6 series: 6 curtailable load options between 0.5 MW and 50 MW. Design: integration with plant process limits, reduced peak demand charges and real-time dashboards. Used by commercial buildings, industrial plants with flexible load and DISCOMs needing peak relief. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Enrolment 4-8 weeks; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Tungabhadraneel
- Model
- TUN-ED2 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Enrolment 4-8 weeks
- Warranty
- Performance reporting
- Standards
- CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Curtailable load0.5 MWTUN-ED2-01 | Curtailable load: 0.5 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load1 MWTUN-ED2-02 | Curtailable load: 1 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load5 MWTUN-ED2-03 | Curtailable load: 5 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load10 MWTUN-ED2-04 | Curtailable load: 10 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load25 MWTUN-ED2-05 | Curtailable load: 25 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load50 MWTUN-ED2-06 | Curtailable load: 50 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
Specifications
| Curtailable load | 0.5 MW to 50 MW (see variants) |
|---|---|
| Programme | TOD optimisation |
| Control | Manual |
| Notice | Day aheadmade to order: 2 hours / 15 minutes |
| Duration per event | 4 hoursmade to order: 1 hour |
| Events per year | 50made to order: 20 / Unlimited |
| Metering | Dedicated interval metermade to order: Existing meter |
| Incentive sharing | 70:30 customer:aggregatormade to order: 80:20 |
| Baseline method | Regression |
| Reporting | Monthly savingsmade to order: Event report |
| Contract term | 1 year |