Peak load management and curtailment, Duo 9 seriesSample
by Tungabhadraneel Associates (Sample) · verified by BARREL
Price for verified buyers
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Tungabhadraneel Associates (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Register your company to see prices.
The Duo 9 service of peak load management and curtailment by Tungabhadraneel covers 5 curtailable load options (1 MW to 50 MW). Design: integration with plant process limits, settlement transparency and revenue for flexible loads. Typically used for DISCOMs needing peak relief, cold storage and water pumping and commercial buildings. Delivered in line with CERC DR Guidelines, State TOD Tariff Orders and OpenADR 2.0b. Mobilisation Assessment in 2-3 weeks; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Tungabhadraneel
- Model
- TUN-ED4 series
- Listing type
- Service
- Unit
- MW
- Minimum order
- 1 MW
- Lead time
- Assessment in 2-3 weeks
- Warranty
- As per programme terms
- Standards
- CERC DR Guidelines, State TOD Tariff Orders, OpenADR 2.0b
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Curtailable load1 MWTUN-ED4-01 | Curtailable load: 1 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load5 MWTUN-ED4-02 | Curtailable load: 5 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load10 MWTUN-ED4-03 | Curtailable load: 10 MW | 1 MW · Assessment in 2-3 weeks | for verified buyers |
| Curtailable load25 MWTUN-ED4-04 | Curtailable load: 25 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
| Curtailable load50 MWTUN-ED4-05 | Curtailable load: 50 MW | 1 MW · Enrolment 4-8 weeks | for verified buyers |
Specifications
| Curtailable load | 1 MW to 50 MW (see variants) |
|---|---|
| Programme | TOD optimisation |
| Control | Automated through SCADA |
| Notice | 2 hoursmade to order: Day ahead / 15 minutes |
| Duration per event | 4 hoursmade to order: 1 hour |
| Events per year | 50 |
| Metering | Dedicated interval meter |
| Incentive sharing | 80:20made to order: 70:30 customer:aggregator |
| Baseline method | Regressionmade to order: 10-day average |
| Reporting | Monthly savingsmade to order: Event report |
| Contract term | 1 yearmade to order: 3 years |