Catalogue / Energy audits

No photo yet

Thermal and utility energy audit, Core seriesSample

by Tungabhadraneel Associates (Sample) · verified by BARREL

Price on quote

Ordered and invoiced through BARREL — one contract, one GST invoice.

Customise and request quote

Made to order: change the marked specification rows to what you need; Tungabhadraneel Associates (Sample) quotes for it.

Or send an open RFQ to every matching merchant.

Thermal and utility energy audit from Tungabhadraneel, Core series: 6 connected load options between 500 kW and 50 MW. Highlights: verification after implementation, power factor and harmonics assessment and savings quantified with measured data. Typically used for PAT designated consumers, commercial buildings and industrial plants. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Audit in 1-2 weeks; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.

Brand
Tungabhadraneel
Model
TUN-396 series
Listing type
Service
Unit
site
Minimum order
1 site
Lead time
Audit in 1-2 weeks
Warranty
Clarifications for 6 months
Standards
Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
Delivers to
North India
GST rate
18 %
Country of origin
India (imported sub-assemblies)
Delivery terms
Site mobilisation as per work order
Returns
Re-work of defective scope at no cost
Other terms
Sample data for testing; not a real offer.

Variants

VariantSpecificationsMin. order · lead timePrice, ex GST
Connected load500 kWTUN-396-01Connected load: 500 kW1 site · Audit in 1-2 weekson quote
Connected load1 MWTUN-396-02Connected load: 1 MW1 site · Audit in 1-2 weekson quote
Connected load5 MWTUN-396-03Connected load: 5 MW1 site · Audit in 1-2 weekson quote
Connected load10 MWTUN-396-04Connected load: 10 MW1 site · Audit in 1-2 weekson quote
Connected load25 MWTUN-396-05Connected load: 25 MW1 site · Report in 2-4 weekson quote
Connected load50 MWTUN-396-06Connected load: 50 MW1 site · Report in 2-4 weekson quote

Specifications

Connected load500 kW to 50 MW (see variants)
Audit levelInvestment-grade audit
InstrumentsUltrasonic flow meter, lux meter
AuditorCertified Energy Manager
ReportSavings opportunities with paybackmade to order: Implementation roadmap
BaselineMeasured baselinemade to order: 12-month bills analysis
Measurement duration3 days
CoverageElectrical and thermal
StatutoryPAT scheme Form-Amade to order: Form-1 and Form-2 filing
DeliverableReport and presentation
Follow-upVerification after implementation

BARREL: Bharat Atom Renewable Resources Energy Limited