Thermal and utility energy audit, Core seriesSample
by Tungabhadraneel Associates (Sample) · verified by BARREL
Price on quote
Ordered and invoiced through BARREL — one contract, one GST invoice.
Customise and request quoteMade to order: change the marked specification rows to what you need; Tungabhadraneel Associates (Sample) quotes for it.
Or send an open RFQ to every matching merchant.
Thermal and utility energy audit from Tungabhadraneel, Core series: 6 connected load options between 500 kW and 50 MW. Highlights: verification after implementation, power factor and harmonics assessment and savings quantified with measured data. Typically used for PAT designated consumers, commercial buildings and industrial plants. Delivered in line with Energy Conservation Act 2001, BEE Energy Auditor Regulations and IS 14160. Mobilisation Audit in 1-2 weeks; serves North India. Sample listing: illustrative data for testing BARREL Shop, not a real offer.
- Brand
- Tungabhadraneel
- Model
- TUN-396 series
- Listing type
- Service
- Unit
- site
- Minimum order
- 1 site
- Lead time
- Audit in 1-2 weeks
- Warranty
- Clarifications for 6 months
- Standards
- Energy Conservation Act 2001, BEE Energy Auditor Regulations, IS 14160
- Delivers to
- North India
- GST rate
- 18 %
- Country of origin
- India (imported sub-assemblies)
- Delivery terms
- Site mobilisation as per work order
- Returns
- Re-work of defective scope at no cost
- Other terms
- Sample data for testing; not a real offer.
Variants
| Variant | Specifications | Min. order · lead time | Price, ex GST |
|---|---|---|---|
| Connected load500 kWTUN-396-01 | Connected load: 500 kW | 1 site · Audit in 1-2 weeks | on quote |
| Connected load1 MWTUN-396-02 | Connected load: 1 MW | 1 site · Audit in 1-2 weeks | on quote |
| Connected load5 MWTUN-396-03 | Connected load: 5 MW | 1 site · Audit in 1-2 weeks | on quote |
| Connected load10 MWTUN-396-04 | Connected load: 10 MW | 1 site · Audit in 1-2 weeks | on quote |
| Connected load25 MWTUN-396-05 | Connected load: 25 MW | 1 site · Report in 2-4 weeks | on quote |
| Connected load50 MWTUN-396-06 | Connected load: 50 MW | 1 site · Report in 2-4 weeks | on quote |
Specifications
| Connected load | 500 kW to 50 MW (see variants) |
|---|---|
| Audit level | Investment-grade audit |
| Instruments | Ultrasonic flow meter, lux meter |
| Auditor | Certified Energy Manager |
| Report | Savings opportunities with paybackmade to order: Implementation roadmap |
| Baseline | Measured baselinemade to order: 12-month bills analysis |
| Measurement duration | 3 days |
| Coverage | Electrical and thermal |
| Statutory | PAT scheme Form-Amade to order: Form-1 and Form-2 filing |
| Deliverable | Report and presentation |
| Follow-up | Verification after implementation |